Preparation method of close-fitting type elastic curing unit
An elastic and close-fitting technology, applied in the track field, can solve problems such as the difficulty in controlling the density of loose ballast, and achieve the effects of facilitating production and transportation, reducing required procedures, and improving integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Such as figure 1 As shown, a method for preparing a close-fitting elastic curing unit comprises the following steps:
[0052] S1. Flip the sleeper 1180°, place it inside the mold 44 of the preparation device 4, and place the upper surface of the sleeper 1 upside down on the upper surface of the base 47;
[0053] S2. Place crushed stones at the discharge port at the upper end of the mold 44, and adjust the compactness of the crushed stones;
[0054] S3. Inject polyurethane into the compacted gravel;
[0055] S4. Lower the first hydraulic rod 451 and the second hydraulic rod 461, and press the first loading plate 452 at the bottom of the first hydraulic rod 451 and the second loading plate 462 at the bottom of the second hydraulic rod 461 on the gravel surface;
[0056] S5. Pressurize the crushed stone through the first hydraulic rod 451 and the second hydraulic rod 461, compact the crushed stone and polyurethane, and form the first bed block 2 and the second bed block...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


