Project progress monitoring method and system

A technology of engineering and progress, applied in other database retrieval, resources, office automation and other directions, can solve the problems of increasing the input workload of on-site personnel, misleading company managers and project managers, and lack of reference, so as to achieve dynamic progress management. , The effect of strong information integrity and high reference value

Pending Publication Date: 2020-06-05
CHINA RAILWAY CONSTR GROUP
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In related technologies, the construction progress management platform based on Building Information Modeling (BIM, Building Information Modeling) technology enters the actual progress of the nodes manually. On the one hand, it increases the workload of on-site personnel. Due to personnel inertia and sense of responsibility, the data is not updated in time, or it is prone to omissions, etc., and the timeliness and information integrity are not guaranteed.
In addition, after the actual progress is input into the above-mentioned BIM-based construction progress management platform, the management of the overall construction progress is based on the Gantt chart. Although it is intuitive, the key path identification is not obvious, and the generated conclusive data that reflects the actual construction progress is time-sensitive. The accuracy, completeness and accuracy are relatively low, lack of reference, it is likely to mislead company managers and project managers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project progress monitoring method and system
  • Project progress monitoring method and system
  • Project progress monitoring method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] Embodiments of the present application will be described in detail below in conjunction with the accompanying drawings. It should be noted that, in the case of no conflict, various embodiments in the present application and various features therein can be combined arbitrarily with each other.

[0019] figure 1 An exemplary flow of the project progress monitoring method in the embodiment of the present application is shown. Such as figure 1 As shown, the exemplary process of the project progress monitoring method in the embodiment of the present application may include:

[0020] Step S101, associating the ready-mixed concrete file of the project with the pre-created BIM, the ready-mixed concrete file including the planned concrete pouring data of different parts in the project;

[0021] Step S102, obtaining actual concrete pouring data on the engineering site;

[0022] Step S103, using the actual concrete pouring data and the planned concrete pouring data of correspo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project progress monitoring method and system. In one embodiment of the invention, the project progress monitoring method can comprise the steps: associating a premixed concrete file of a project with a pre-created building information model, wherein the premixed concrete file comprises planned concrete pouring data of different parts in the project; acquiring actual concrete pouring data of the engineering field; generating a double-code network diagram by utilizing actual concrete pouring data and planned concrete pouring data of corresponding components in the building information model; determining a progress state of a component in a project by utilizing the dual-code network diagram; and visually displaying the progress state of the component in the project.The dynamic progress management of the project is realized, the timeliness is good, the information integrity is strong, the accuracy is high, and the implementation situation of the project can be conveniently supervised and managed by related personnel according to the project progress state.

Description

technical field [0001] The invention relates to the technical field of engineering construction, in particular to a method and system for monitoring engineering progress. Background technique [0002] At present, in the field of engineering technology, it is necessary to monitor the progress of the project in real time. In related technologies, the construction progress management platform based on Building Information Modeling (BIM, Building Information Modeling) technology enters the actual progress of the nodes manually. On the one hand, it increases the workload of on-site personnel. Due to personnel inertia and sense of responsibility, data updates are not timely, or omissions are prone to occur, and timeliness and information integrity are not guaranteed. In addition, after the actual progress is input into the above-mentioned BIM-based construction progress management platform, the management of the overall construction progress is based on the Gantt chart. Although ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06F16/901
CPCG06Q10/0633G06Q10/103G06Q50/08G06F16/9024
Inventor 郭伟方宏伟杜会军王宽
Owner CHINA RAILWAY CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products