A dynamic optimization method for preventive replacement timing of water supply pipe network
A water supply network and preventive technology, applied in the technical field of dynamic optimization of the timing of preventive replacement of the water supply network, can solve the problem that the reliability of the water supply network system is damaged, the economy and reliability cannot be considered at the same time, and dynamic economic analysis cannot be performed And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] A dynamic optimization method for preventive replacement of water supply pipe network:
[0043] The specific implementation of this technical method includes the following six steps:
[0044] Step 1: Carry out failure rate analysis and hydraulic calculation of water supply pipe network
[0045] According to the historical record data, the failure rate (including leakage and burst) of the water supply pipe network is analyzed, and the historical data statistical measurement regression equation of the failure rate of the water supply pipe and the influencing factors such as pipe diameter, pipe length, and pipe age is obtained. For water supply pipe networks with complex pipe materials, the failure rate of pipes needs to be identified separately by pipe materials. For the pipelines that take preventive renewal measures in the current year, the pipe age is set to zero, and the failure rate and reliability of the pipelines are recalculated. Changes in the failure rate of p...