Unlock instant, AI-driven research and patent intelligence for your innovation.

A double-width four-cable plane multi-tower cable-stayed bridge

A technology for supporting tree stumps and cable-stayed bridges, which is applied in the direction of cable-stayed bridges, erection/assembly bridges, bridges, etc., and can solve problems such as increasing the scale of cable towers and foundations, increasing bridge construction costs, and complex stress on cantilever X-shaped brackets

Active Publication Date: 2021-08-17
江苏华通工程技术有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Adopting the scheme of increasing the geometric dimensions of the cable tower structure and the main beam structure, that is, using a large-scale cable tower structure to increase the stiffness of the bridge tower and the main beam structure, will increase the cost of the bridge, which is very uneconomical; adopting the tower beam consolidation scheme will lead to temperature effects The increase of the force on the bridge tower under the action will increase the scale of the cable tower and the foundation; the use of side spans to set auxiliary piers and transition piers has some effect on three-tower cable-stayed bridges, and for multi-tower cable-stayed bridges with more than four spans, the other It cannot improve the force bearing of the intermediate bridge towers, nor can it reduce the problem of excessive live load displacement of the main girder of the intermediate span; adopting the scheme of setting auxiliary cables, and setting auxiliary cables between the cable towers is an effective method to improve the stiffness and stability of multi-tower cable-stayed bridges , however, affects the aesthetics of the bridge
[0006] The Jiashao Bridge is a Strait Bridge across the Hangzhou Bay. It adopts a double-width, four-cable plane, and six-tower cable-stayed bridge structure system. The Jiashao Bridge proposes that the cable towers be equipped with cantilevered X-shaped brackets, and the main girder is equipped with longitudinal double-row supports. The relative rotation degrees of freedom between the main girder and the cable tower are constrained to improve the stress of the multi-tower cable-stayed bridge. The beam consolidation system is basically the same, which can solve the problem of the vertical stiffness of the main girder of the multi-tower cable-stayed bridge with weak tower structure. However, the force of the cantilever X-shaped bracket is very complicated. The construction of the standard cantilever X-shaped bracket is very difficult, and the construction of the negative moment steel bar of the cantilever X-shaped bracket anchored to the tower column is very difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A double-width four-cable plane multi-tower cable-stayed bridge
  • A double-width four-cable plane multi-tower cable-stayed bridge
  • A double-width four-cable plane multi-tower cable-stayed bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0054] A double-width four-cable surface multi-tower cable-stayed bridge with tree stump flowerpot-shaped brackets of ring-row supports of the present invention, comprising bridge tower foundation 1, variable cross-section prestressed steel pipe concrete hollow column bridge tower 2, tree stump flowerpot-shaped brackets Frame 3, ring-arranged support 4, double-width main girder deck 5, cable-stayed cables 6 and artificial leaf tower crown 7, characterized in that: variable cross-section prestressed steel pipe concrete hollow column bridge tower 2 is set on the bridge tower foundation 1 , the tree stump flowerpot-shaped bracket 3 rests on the bridge tower foundation 1, the tree stump flowerpot-shaped bracket 3 wraps the variable-section prestressed steel pipe concrete hollow column bridge tower 2, and the top of the tree stump flowerpot-shaped bracket 3 is arranged in a circular arrangement The support 4, the double-width main girder bridge deck 5 rest on the stump flowerpot-sha...

Embodiment 2

[0058] A construction method for a double-width four-cable surface multi-tower cable-stayed bridge with tree stump flowerpot-shaped brackets ring-row support, characterized in that it includes the following steps:

[0059] Step 1: Carry out the bridge site selection of the double-width four-cable plane multi-tower cable-stayed bridge, drive the pile foundation, carry out the construction of the bridge tower foundation 1, carry out the construction of the approach bridge, and carry out the construction of the single-leaf hyperboloid side pier 8;

[0060] Step 2: On the bridge tower foundation 1, install variable-section outer steel pipes 21 and inner steel pipes 22, arrange unbonded prestressed steel bars 24 in the pipes, pour concrete 23 in the pipes, install perforated diaphragms 25, and form variable cross-sections Prestressed steel tube concrete hollow column bridge tower 2;

[0061] Step 3: before the initial setting of the concrete 23 in the pipe, stretch a small amount o...

Embodiment 3

[0068] For a Strait Bridge, the span of the main bridge is 200+3×400+200 meters, a double-width, four-cable plane, three-tower cable-stayed bridge, and the approach bridge is a continuous beam of 5×60 meters. The main bridge adopts a double-width four-cable plane multi-tower cable-stayed bridge structure with ring-row supports, tree stumps, and flowerpot-shaped brackets. The total span of the bridge deck is 60 meters, and the width of the left and right steel box girders is 24 meters. The net distance between the left and right steel box girders is 12 meters. Four-cable-plane cable-stayed cables obliquely suspend the double-width main girder deck. The distance between the cables is 20 meters. A 3-meter-wide steel box girder is installed every 60 meters to connect the left and right steel box girder deck girders.

[0069] The bridge tower foundation cap of this bridge is elliptical. On the bridge tower foundation, a variable-section prestressed steel pipe concrete hollow column...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention proposes a double-width, four-cable plane, and multi-tower cable-stayed bridge with tree stump flowerpot-shaped brackets with ring-row supports, which has the advantages of good structural rigidity, beautiful shape, convenient construction, and reasonable economy. On the bridge foundation, a stump flowerpot-shaped bracket with a single-leaf hyperboloid thin shell is set, and ring-row supports are set on the top of the tree-stump flowerpot-shaped bracket to support the double-width main girder bridge deck. The ring-row support system can restrain the main beam and cables. The relative rotation between the towers improves the structural rigidity of the multi-tower cable-stayed bridge. Uniformly arrange unbonded prestressed steel strands in the variable-section concrete-filled steel tube hollow column bridge pylons, stretch the prestressed steel bars to squeeze the concrete, improve the compactness of the concrete in the tube, and solve the interface between the large-diameter steel tube and the core concrete column Separating the problem and improving the structural stiffness of the pylon columns of variable-section concrete-filled steel tube bridges. Paste simulated bark around the pylons of variable-section prestressed concrete-filled steel tube bridges, and set artificial leaf crowns on top of the pylons of variable-section prestressed steel tube concrete bridges to enhance the landscape effect.

Description

technical field [0001] The invention belongs to the field of civil engineering, and relates to a cable-stayed bridge structure, in particular to a double-width, four-cable plane, and multi-tower cable-stayed bridge with ring-row supports, tree stumps and flowerpot-shaped brackets. Background technique [0002] The double-width four-cable plane multi-tower cable-stayed bridge is a cable-stayed bridge with three or more single-column towers. With the advantages of small area and reasonable economic indicators, the double-width four-cable plane multi-tower cable-stayed bridge is well received by the bridge engineering community. [0003] In view of the mechanical characteristics of the double-width four-cable plane multi-tower cable-stayed bridge, the two sides of the middle tower of the double-width four-cable plane multi-tower cable-stayed bridge have neither auxiliary piers and transition piers nor end anchor cables, and there is no support for the main girder and cable towe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D11/04E01D21/00E01D19/14E01D19/16E01D19/02E01D19/04
CPCE01D11/04E01D19/02E01D19/047E01D19/14E01D19/16E01D21/00
Inventor 袁微微竺伟张红雷王为圣杜高明纪军周永峰朱兆敏李勇
Owner 江苏华通工程技术有限公司