Horizontal waterproof deformation joint structure and construction method thereof
A technology for deformation joints and levels, applied to roads, pavement details, roads, etc., can solve the problems of single waterproofing method for deformation joints and cannot meet the plane method of deformation joints, and achieve the effect of meeting the force requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Refer to attached Figure 1-2 As shown, the present invention provides a technical solution: a horizontal waterproof deformation joint structure, including a decorative surface layer 1 .
[0036] The bottom side of the facing surface layer 1 is provided with two concrete return platforms 2, wherein a gap is reserved between the two concrete return platforms 2, two caulking pastes 3 are arranged in the facing surface layer 1, and waterproof Layer 4, a steel plate 5 is arranged between the two caulking pastes 3, two cement mortar cushions 6 are arranged on the bottom side of the steel plate 5, and a galvanized thin steel plate 7 is arranged on the bottom side of the two cement mortar cushions 6. Insulation material 8 is filled between the steel plate 5, the two cement mortar cushions 6 and the galvanized thin steel plate 7 in the gap between the two concrete return platforms 2, and is located under the waterproof layer 4 between the two concrete return platforms 2 A fire...
Embodiment 2
[0046] The steel plate 5, cement mortar cushion 6, galvanized thin steel plate 7 and waterproof layer 4 are fixedly connected to the concrete return platform 2 through expansion bolts 12; At the same time, the side fixed by the expansion screw is still, and the side not fixed by the expansion screw slides left and right as the vehicle drives, which can meet the deformation requirements.
[0047] Refer to attached image 3 As shown, a horizontal waterproof deformation joint construction method includes the following steps:
[0048]S1. Determine the height of the concrete return platform. Before or after the structural construction, determine the return platform height in advance according to the building surface method, reserve the deformation joints before the construction method and complete the concrete pouring and repair work, and ensure the return platform height on both sides consistent;
[0049] S2, adding a fire-stop zone, according to the completion of the constructi...