Processing method of anti-sliding pile buffer layer coupled with porous buffer structure and shock-absorbing protective layer
A processing method and technology of anti-sliding piles, which are applied in the direction of foundation structure engineering, excavation, protection devices, etc., can solve the problems of insufficient tensile strength, fracture damage, weak tensile strength of the front side of the pile, etc., and achieve uniform force and reduce Back and forth shearing, avoiding the effect of stress concentration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The present invention will be described in further detail below in conjunction with the accompanying drawings. The following specific implementation steps can enable those skilled in the art to understand the present invention more comprehensively, but do not limit the present invention in any form.
[0049] First of all, it needs to be explained that the production of high damping rubber and CFRP board belongs to the prior art, and its definition or concept belongs to the content known or mastered by those skilled in the art. Therefore, unless there is a specific meaning in the present invention, other meanings that are consistent with the existing known meanings will not be expressed one by one in the present invention.
[0050] In the present invention, the anti-sliding pile cushioning layer that couples the porous high damping structure and the high-strength protective layer is as follows: Figure 5 , 6 As shown in , a columnar anti-slide pile 1 is surrounded by a f...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 