Water-rich sand layer pre-stressed anchor cable installation method
A technology of prestressed anchor cables and installation methods, applied in excavation, sheet pile walls, construction, etc., can solve problems such as inability to specify solutions, non-fitting, affecting the stability of anchor cable installation and practical usability, and achieve efficiency And the effect of high safety and stability and improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] A method for installing a prestressed anchor cable in a water-rich sand layer, including the stage of on-site environmental exploration, the stage of detection, the stage of formulating an installation plan, and the stage of actual installation, including the following installation steps:
[0031] Step 1: On-site environmental exploration stage: understand the environment of the installation site through on-site inspection;
[0032] Step 2: Detection stage: Sampling and testing the water content of the sand layer and testing the hardness of the fixed rock formation;
[0033] Step 3: Formulate the installation plan stage: draw up the installation plan according to the test results combined with the field exploration situation;
[0034] Step 4: Actual installation stage: Carry out actual construction according to the established installation plan.
[0035] The field environmental exploration stage includes observing the distribution range of the sand layer and the requir...
Embodiment 2
[0039] In the detection stage, it is necessary to detect the water content of the sand layer and the strength of the fixed rock formation;
[0040] The sampling equipment samples the sand layer by drilling holes, sends the sand layer samples obtained from the drilling holes for inspection, detects the water content in the sand layer, and adopts a multi-stage continuous sampling method to continuously and comprehensively sample the sand layer at the installation location, and different The sampling position of the sand layer and the water content of the sampled sand layer at the corresponding position are recorded separately, which is convenient for actually grasping the geological conditions of the sand layer, and provides a basis for the subsequent formulation of the installation plan;
[0041] The sampling drilling equipment drills through the sand layer to sample the fixed rock layer, and uses an extruder to analyze the strength of the fixed rock layer, and the fixed rock la...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com