Unlock instant, AI-driven research and patent intelligence for your innovation.

Shale gas horizontal well full-life-cycle drainage and gas production integrated string and construction method

A full-life-cycle, drainage and gas production technology, applied in the fields of fluid production, earth-moving drilling, wellbore/well components, etc., can solve the problems of large amount of flowback fluid, difficult fracturing fluid, and inability to penetrate the full life cycle of gas wells, etc.

Active Publication Date: 2020-11-03
CHINA PETROLEUM & CHEM CORP +1
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Atmospheric pressure gas reservoirs generally have the characteristics of large flowback fluid volume, low formation pressure, and difficulty in effectively discharging fracturing fluid by relying on formation energy. The fluid accumulated in the wellbore is difficult to discharge by relying on the formation's own energy, and normal blowout testing or production cannot be performed.
At present, the development of this kind of atmospheric gas reservoirs at home and abroad mainly uses electric submersible pumps, jet pumps, and gas lift valves to carry out forced drainage. A certain stage cannot run through the whole life cycle of the gas well
At present, although some progress and achievements have been made in the research on the drainage technology of atmospheric shale gas, it is still limited to a certain technology, and its limitations will gradually be exposed with the prolongation of the mining time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shale gas horizontal well full-life-cycle drainage and gas production integrated string and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] In order to better understand the present invention, the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0016] Such as figure 1 As shown, the entire life cycle drainage and gas production integrated string of shale gas horizontal wells includes tubing 1, casing 6, and tail pipe 7. The top of the tubing is suspended in the casing by a tubing hanger, and multiple eccentrics are arranged on the tubing. Type gas lift valve 2, the middle and lower part of the tubing is connected to the plunger limit puppet 3, the bottom of the tubing is connected to the top of the positive circulation jet pump 4, the bottom of the positive circulation jet pump is connected to the top of the tail pipe, and the casing is sleeved over the tubing and tail pipe. The center is aligned, and a packer 5 is provided in the annulus between the upper part of the tail pipe and the corresponding position of the casing.

[0017] The upper and lo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a shale gas horizontal well full-life-cycle drainage and gas production integrated string and a construction method. The string comprises an oil pipe, a casing pipe and a tail pipe, the top end of the oil pipe is hung in the casing pipe through an oil pipe hanger, a plurality of eccentric gas lift valves are arranged on the oil pipe at intervals, and the lower middle portionof the oil pipe is connected with a plunger limiting short section. The bottom end of the oil pipe is connected with the top of a direct-circulation injection pump, the bottom of the direct-circulation injection pump is connected with the top end of the tail pipe, the casing pipe sleeves the oil pipe and the tail pipe and is centrally aligned, and a packer is arranged in an annulus, correspondingto the casing pipe, of the upper portion of the tail pipe. Gas well drainage and gas production processes of optimized strings, gas lift valves and plungers are integrated, process switching and connection are completed through one string, and the high-yield liquid whole-well life-cycle drainage and gas production technology can be achieved.

Description

Technical field [0001] The invention belongs to the technical field of petroleum and natural gas, and in particular relates to a shale gas horizontal well full life cycle drainage and gas production integrated pipe string and a construction method. Background technique [0002] With the continuous expansion of shale gas development areas, atmospheric shale gas reservoirs have become a new research direction. Atmospheric gas reservoirs generally have the characteristics of large flowback fluid volume, low formation pressure, and the fracturing fluid is difficult to effectively discharge by the formation energy. The fluid accumulation in the wellbore is difficult to be discharged by the formation's own energy, and normal discharge testing or production cannot be carried out. At present, the development of such atmospheric gas reservoirs at home and abroad mainly uses electric submersible pumps, jet pumps, and gas lift valves for forced drainage. However, it has also been found that...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B43/00
CPCE21B43/12E21B43/122E21B43/124Y02E10/10
Inventor 胡德高王大江陈建达黄晓凯李牧张丽媛吴魏张怀力廖如刚徐兴权程永红孙志扬吴圣发费成俊李之帆
Owner CHINA PETROLEUM & CHEM CORP