Double-screw quick splicing parts for steel connecting rods between prefabricated concrete components
A rapid splicing and prefabricated concrete technology, which is applied to building components, structural elements, building reinforcements, etc., can solve the problems of high cost, slow screwing speed, and easy jamming of long straight tube components, and achieve simple structure, firm combination, The effect of reliable docking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] In order to explain the technical content, constructive features of the present invention, the embodiments, the following combined embodiments are described below, and the accompanying drawings will be described in detail.
[0024] reference figure 1 As shown, the preform member of the present invention includes two screw rapid splicing members including two bolt rods 1, two nuts 2, two links 3, two tutorial positioning cards 4 and a link reinforcing rib. 5, where:
[0025] The two links 3 are disposed in parallel, and the two end portions of the two links 3 provided in parallel are respectively provided with a nut body 2.
[0026] The bolt rod 1 is screwed onto the nut body 2 to screw the nut 6.1 reserved on the preform member 6; the bolt rod 1 is relatively loose to the screw bodies 2, so that it can be adaptable to it. And the positional deviation at the time of the buffer installation, since it is loose screw, in order to ensure the intensity of the connection, it can b...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


