Regional short-term traffic flow prediction method and system based on Internet of Vehicles big data
A technology of short-term traffic flow and prediction method, which is applied in the field of regional short-term traffic flow prediction based on the big data of the Internet of Vehicles, can solve problems such as prediction of various types of vehicles, and achieve the goal of improving the traffic management and control ability of the park and improving the prediction accuracy. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] In the industrial park, there are many types of commercial freight vehicles, and the parking spaces are set up for parking, unloading and loading of different types of vehicles. The unloading manipulators are inconsistent, so the corresponding types of trucks need to be parked in the corresponding parking spaces for unloading) It is difficult to predict the type of vehicles and their corresponding quantities due to the existing forecasting technology. All the parking spaces used to park this type of vehicles, if the merchant still employs this type of freight vehicles to distribute goods in this section at this time, since there are no vacant parking spaces for this type of vehicles to park and unload, obviously need to wait , As a result, the distribution of goods by merchants cannot be completed in time.
[0049] Therefore, a regional short-term traffic flow prediction method based on the big data of the Internet of Vehicles in this embodiment 1, such as figure 1 sho...
Embodiment 2
[0083] The difference between this embodiment and Embodiment 1 is that, with one week as the unit time, to predict the traffic flow situation of the next week, the time zone of one week can be divided into 7 days, and the forecast number of the next week=sum 7 days {using statistical method The number of predictions obtained × [(the average value of the real traffic flow of each day in the past week / the average value of the real situation of the weekly traffic flow in the past) × the accuracy rate of the corresponding traffic flow forecast for each day]}.
Embodiment 3
[0085] The difference between this embodiment and Embodiment 1 is that, to predict the traffic flow in the next month by taking the month as the unit of time, the time zone of one month can be divided into four weeks or 30 days.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com