Standpipe through concrete floor dry assembly

A technology for standpipes and floor slabs, applied in the direction of pipes/pipe joints/fittings, pipes, mechanical equipment, etc., to achieve the effects of simple risers, simplified management, and smooth construction and installation

Active Publication Date: 2021-08-31
福州鼓楼纹英建筑工程有限责任公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In view of the above problems, the present invention provides a dry-installation assembly for riser pipes through concrete floors, which not only solves the anti-leakage problem of traditional laying and pouring concrete plugging, but also is the assembly and maintenance of riser pipes. The installation is smooth, rework is avoided, the maintenance and replacement of the standpipe is simple, and there is no static operation that interferes with neighbors; at the same time, there is no need for multi-work cooperation during the installation operation, saving labor, simplifying management, and good quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Standpipe through concrete floor dry assembly
  • Standpipe through concrete floor dry assembly
  • Standpipe through concrete floor dry assembly

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] In order to describe the technical content, structural features, achieved goals and effects of the present invention in detail, the following will be described in detail in conjunction with the embodiments and accompanying drawings.

[0025] refer to Figure 1 to Figure 5 , The standpipe piercing concrete floor dry installation assembly of the present invention includes a pipe ring sleeve 1, a positioning adjustable rod 2 and an artistic cover cap 3.

[0026] The set of pipe rings 1 is pre-embedded at the passing position of the standpipe required by the design when pouring the building concrete floor 4 , thereby forming a standpipe passing hole on the concrete floor 4 .

[0027] A lower reinforcing ring rib 1.1 is provided on the outer side of the lower part of the pipe group ring sleeve 1, and a nail hole 1.11 for fixing to the floor formwork is opened on the lower reinforcement ring rib 1.1, so as to facilitate accurate pre-embedding of the pipe group ring sleeve 1. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a dry installation assembly for vertical pipes passing through concrete floors, which includes a pipe assembly ring sleeve, a positioning adjustable rod and an artistic cap. In terms of position; the lower outer side of the lower part of the pipe set ring is provided with a lower reinforcing ring rib, the outer part of the middle part is provided with a waterproof ring, and the upper outer part is provided with an upper reinforcing ring rib. When the standpipe is installed in place, the standpipe and the set pipe A plurality of positioning adjustable rods are arranged between the ring sleeves, so that the riser is fixed in the ring sleeve of the pipe assembly, the upper port of the artistic cover cap is fixed on the standpipe, and the lower port of the artistic cover cap can completely cover the pipe assembly ring set. The invention not only solves the anti-leakage problem of traditional laying and pouring concrete plugging, but also is the component on which the riser assembly and maintenance rely, so that the construction and installation are smooth, rework is avoided, the maintenance and replacement of the standpipe is simple, and no disturbance to neighbors is generated. static operation; at the same time, the installation process does not require the cooperation of multiple types of work, saving labor, simplifying management, and good quality.

Description

technical field [0001] The invention relates to the field of construction, in particular to a dry assembly assembly for vertical pipes passing through concrete floor slabs. Background technique [0002] In civil high-rise buildings, a large number of facility risers must pass through the concrete floor, and the usual way is to set a reserved hole when pouring the concrete floor. Due to the construction process of the multi-layer slab, it is easy to cause the positions of the reserved holes on the multi-layer slab to be inconsistent and not on the same vertical line, or the shape of the reserved holes is deformed during pouring, which leads to the modification of the reserved holes when installing the riser, except In addition to time-consuming and labor-intensive secondary repairs, it is also easy to cause leakage of construction joints between old and new concrete. Even if the position and shape of the reserved holes are correct, there is still a problem of leakage between...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): F16L5/02
CPCF16L5/02
Inventor 肖斯昕肖斯熔肖纹籛
Owner 福州鼓楼纹英建筑工程有限责任公司