Slag removal control method for long-distance rock pipe jacking construction
A control method, long-distance technology, applied in the direction of pipeline laying and maintenance, pipe/pipe joint/pipe fittings, mechanical equipment, etc., can solve the problem of reduced mud lubrication effect, increased pipe-rock friction coefficient, and increased contact pressure of pipe joints and other problems, to achieve good lubrication effect, prolong engineering time, and reduce frictional resistance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] Embodiments of the technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solutions of the present invention more clearly, and therefore are only examples, rather than limiting the protection scope of the present invention.
[0034] Such as figure 1 The flow chart of the long-distance rock pipe jacking construction slag removal control method shown, the control method includes:
[0035] Step 1-1, determining the frictional resistance threshold per unit length of the pipe joint in long-distance rock pipe jacking construction;
[0036] Step 1-2, monitor the jacking force and head resistance of the pipe jacking machine, and determine the frictional resistance per unit length of the pipe joint according to the monitoring results;
[0037] Step 1-3, judging whether the frictional resistance per unit length of the pipe joint exceeds the fri...