[0027] Embodiment 1: as figure 1 An energy-saving and optimized pipe network superimposed water supply control system is shown, including a pipe network superimposed water supply system that is connected to the municipal pipe network and pressurizes the municipal pipe network to supply water to the user end, and is used to control the user end pipe network The pipe network control subsystem that monitors the pressure and controls the pipe network superimposed pressure water supply system; figure 2 As shown, the pipe network superimposed pressure water supply system includes a pressure stabilization compensation tank 1 connected to the municipal pipe network, a water pump assembly 2 for connecting the pressure stabilization compensation tank 1 to the user end pipe network, and a water pump assembly installed on the pressure stabilization compensation tank 1 Energy storage 3, negative pressure remover 4, and frequency conversion control cabinet 5 for frequency conversion proces...
Embodiment 2
[0039] Embodiment 2: The difference from Embodiment 1 is that multiple sets of branch water pump groups 22 are used to supply water to areas of different water supply areas. Second water supply area, ..., 5(n-1)+1~5n layer nth water supply area; branch water pump group 22 includes the conventional water supply pump that is used for low water volume, and is used for the standby that high water volume is used for compensation Water supply pump.
[0040] It should be noted that: in this embodiment, the actual floor is 12 floors, and three groups of branch water pump groups 22 are set up for the first water supply area on the 1st to 5th floors, the second water supply area on the 6th to 10th floors, and the second water supply area on the 10th to 12th floors. of the third water supply area.