Safe and efficient construction method for upper-soft and lower-hard rock mass large-section underground excavation tunnel

A construction method and large-section technology, which can be used in tunnels, tunnel linings, installation of anchor rods, etc., can solve problems such as uneconomical, small blocks, and small step distances, so as to reduce the construction period, reduce the time for closing a loop, and reduce The effect of construction costs

Active Publication Date: 2021-01-22
中铁隧道集团二处有限公司 +3
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, for the construction of underground excavation tunnels with large lithology changes in the tunnel section, when the classic CD method, CRD method and double-side pilot pit method are adopted, the method is suitable for the layer with poor lithology. Uneconomical and unreasonable situations such as super-strong support, small step distance, and small block division occur in layers with better lithology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Safe and efficient construction method for upper-soft and lower-hard rock mass large-section underground excavation tunnel
  • Safe and efficient construction method for upper-soft and lower-hard rock mass large-section underground excavation tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] It should be noted that the following detailed description is exemplary and intended to provide further explanation of the present invention. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0025] It should be noted that the terminology used here is only for describing specific embodiments, and is not intended to limit exemplary embodiments according to the present invention. As used herein, unless the invention clearly states otherwise, the singular form is also intended to include the plural form. In addition, it should also be understood that when the terms "comprising" and / or "comprising" are used in this specification, their Indicate the presence of features, steps, operations, means, components and / or combinations thereof;

[0026] This embodiment proposes a safe and efficient construction method for large-section submerged ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a safe and efficient construction method for an upper-soft and lower-hard rock mass large-section underground excavated tunnel. A CD construction method is improved under specific stratum conditions. A whole tunnel section is provided with upper steps and lower steps and is divided into four cavities in the left and right, and the construction method comprises the steps that 1, an upper step left pilot tunnel is excavated, then primary support is conducted, and a middle partition wall of the upper step is constructed; 2, an upper step right pilot tunnel is excavated, preliminary bracing is conducted, and the middle partition wall is dismantled; 3, a lower step left pilot tunnel and a left lower inverted arch are excavated, and primary support of the left lower stepand the left lower inverted arch is conducted synchronously; 4, a lower step right pilot tunnel and a lower right inverted arch are excavated, and primary support of the lower right step and the lowerright inverted arch is conducted synchronously; 5, an inverted arch is constructed; and 6, waterproof plates are laid, secondary lining pouring is conducted, and therefore excavation and supporting of the tunnel are completed. The construction method can be suitable for tunnel excavation of a stratum with uneven lithology, especially in a rock body with the soft upper portion and the hard lower portion, and the adaptability of the construction method to stratum changes and the flexibility of construction method conversion can be reflected.

Description

technical field [0001] The invention relates to a safe and high-efficiency construction method that can be used in projects such as highways, railways and subways to pass through large-section submerged tunnels with upper soft and lower hard rock masses. Background technique [0002] With the rapid development of my country's transportation industry, the construction scale of traffic tunnels such as highways, railways and municipal tunnels is increasing, and it shows a trend of gradually increasing length, section and span. For the excavation of large-section and super-large-section tunnels, higher construction technology is required, and the construction efficiency should be improved as much as possible under the premise of ensuring construction safety. [0003] At present, the main excavation methods for large-section tunnels include the CD method, the CRD method, and the double-side-wall pilot-pit method. These construction methods have different adaptability to geologic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/00E21D11/00E21D11/10E21D20/02E21D11/15E21D11/18E21D11/38
CPCE21D9/00E21D9/001E21D11/00E21D11/105E21D20/02E21D11/152E21D11/18E21D11/38
Inventor 王丙坤朱永学李志军赵宝锋柏连才徐帮树刘英谢丰泽张成勇王建林琳李社伟卢素明张剑王研张青史勇蒋勇谭登红汪龙辉厉文龙
Owner 中铁隧道集团二处有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More