A kind of heat preservation and energy saving prefabricated building wall installation and construction method

A technology for building walls and construction methods, applied in construction, building structure, processing of building materials, etc., can solve the problems of time-consuming, inability to correspond to adjustment, and cumbersome process, so as to ensure accuracy, eliminate looseness, and improve stability. Effect

Active Publication Date: 2022-03-08
吴梦遥
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the installation of prefabricated building walls today requires a lifting machine to lift the prefabricated building walls one by one to the splicing installation position, and then the construction personnel can hold the wall by hand to control the falling direction of the wall. It is clamped and fixed, and then assembled and installed. This process is cumbersome and time-consuming, and it cannot be adjusted according to the angle change of the installation position. It cannot adapt to the faster installation rhythm and affects the construction efficiency. Therefore, the present invention provides a A kind of thermal insulation and energy-saving prefabricated building wall installation and construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of heat preservation and energy saving prefabricated building wall installation and construction method
  • A kind of heat preservation and energy saving prefabricated building wall installation and construction method
  • A kind of heat preservation and energy saving prefabricated building wall installation and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further elaborated below in conjunction with specific drawings. It should be noted that, in the case of no conflict, the embodiments and Features in the embodiments can be combined with each other.

[0027] Such as Figure 1 to Figure 8 As shown, a thermal insulation and energy-saving prefabricated building wall installation method uses a building wall installation construction equipment, the construction equipment includes a clamping mechanism 1, a main frame mechanism 2 and a delivery mechanism 3, and the above-mentioned construction The specific method of installing the equipment on the building wall is as follows:

[0028] S1. Clamping and placement: place the prefabricated building wall on the delivery mechanism 3 through a special fixture, and clamp and fix the prefabricated building wall;

[0029] S2. Pos...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a thermal insulation and energy-saving assembled building wall installation and construction method, comprising a clamping mechanism, a main frame mechanism and a delivery mechanism, the delivery mechanism is installed on the main frame mechanism, and the delivery mechanism is located on the main frame Inside the mechanism, a clamping mechanism is located directly above the delivery mechanism, and the clamping mechanism is installed on the outer wall of the main frame mechanism; Lift the prefabricated building walls one by one to the splicing installation position, and then the construction personnel can hold the wall by hand to control the direction of the wall's fall, clamp and fix it, and then assemble and install. This process is cumbersome. It is time-consuming, and cannot be adjusted according to the angle change of the installation position, cannot adapt to a faster installation rhythm, and affects construction efficiency and other issues.

Description

technical field [0001] The invention relates to the technical field of thermal insulation building wall installation, in particular to a thermal insulation and energy saving assembled building wall installation method. Background technique [0002] With the development of society and the improvement of people's living standards, the requirements for housing, office buildings and other architectural environments have also increased. Today, thermal insulation and energy-saving walls have become new requirements for buildings; this kind of wall meets the public's expectations. The requirements of suitable temperature and the trend of environmental protection and energy saving are used by more and more builders in construction; and with the development of modern industrial technology, building houses can be manufactured in batches and complete sets just like machine production. The prefabricated house components are transported to the construction site and assembled; [0003] H...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/16E04G21/18
CPCE04G21/167E04G21/162E04G21/1841
Inventor 吴梦遥吴传江
Owner 吴梦遥