Efficient, multi-element and accurate drilling group construction result evaluation method
A result evaluation and multivariate technology, applied in earthwork drilling, special data processing applications, measurement, etc., can solve the problems of inability to provide reasonable remedial measures, large design and production errors, inaccurate comparison and evaluation of drilling control range and hole spacing, etc. problems, to achieve the effect of improving evaluation efficiency and evaluation accuracy, reducing judgment errors, and intuitive evaluation results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments.
[0054] Example: such as Figure 1-4 As shown in the present invention, a method for evaluating the construction results of a group of high-efficiency, multivariate and accurate boreholes includes the following steps:
[0055] Preparatory work: After the on-site construction of the interlayer drilling group is completed, record the data information of the drilling to stop the coal construction in detail, establish a database based on the Excel working surface, and convert the parameters and basic conditions of the drilling to stop the coal construction into data for storage , according to the design parameters of the drilled holes and the on-site construction conditions, it is summarized and organized into an electronic ledger for drilling construction.
[0056] The data information of drilling construction includes design parameters, construct...