Supercharge Your Innovation With Domain-Expert AI Agents!

Bus real-time scheduling and signal control method based on double-layer planning

A technology of signal control and real-time scheduling, which is applied in real-time bus scheduling and intersection signal control, transportation and traffic information engineering and control fields, and can solve problems such as not taking into account the impact of signal timing schemes

Active Publication Date: 2021-04-16
CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY
View PDF10 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] After searching the literature of the prior art, it is found that the existing bus real-time dispatching and signal control methods have achieved a lot of results in the problem of equalizing the headway, but most of the intersection signal control is only to meet the constraints of the headway. Neglecting the delay of buses at intersections, or improving the traffic flow while ignoring the impact on headway, or not taking into account the impact of signal timing scheme, vehicle speed and stop time on headway

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bus real-time scheduling and signal control method based on double-layer planning
  • Bus real-time scheduling and signal control method based on double-layer planning
  • Bus real-time scheduling and signal control method based on double-layer planning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0087] combined with Figure 1-4 And embodiment, technical solution of the present invention is described as follows further:

[0088] Example: select as image 3 A bus line shown is the research object. The research section contains 7 bus stops and 6 signal-controlled intersections. The total number of buses running on the line at the current moment is , and numbered sequentially. For the driving speed information of all buses in the road section, the stop time at the station is 25s, the minimum driving speed of the vehicles in the research road section is 30 km / h, the maximum driving speed is 50 km / h, and the parking time needs to be at least 20s and at most 30s. For all intersections in the road section, the minimum green light time of each phase is 15s, the minimum green light time is 40s, the yellow light time is 3s, and the full red time is 2s. The current moment is , and the collected bus data and intersection data are shown in Table 1.

[0089] Table 1 Transit data ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bus real-time scheduling and signal control method based on double-layer planning. The method comprises the steps: firstly collecting and researching the distances between buses on a road section, the distances between the buses and intersections, and the signal timing schemes of bus request phases of the intersections; then calculating the current situation signal delay and the initial time headway of the bus at the intersection, finally, establishing an upper-layer model oriented to time headway balance, establishing a lower-layer model oriented to the minimum intersection bus delay, and calculating to obtain a signal timing scheme and a bus scheduling scheme. The method can be used for balancing the bus head time interval and relieving bus crossing.

Description

technical field [0001] The invention belongs to the fields of traffic transportation and traffic information engineering and control, and relates to the fields of real-time bus dispatching and intersection signal control, and more specifically, relates to a method for real-time bus dispatching and signal control based on double-layer planning. Background technique [0002] With the development of society and economy, the number of cars increases, and the supply of road facilities exceeds the demand. As an important road public transportation mode, buses have a small per capita road occupancy rate due to their large-capacity properties. Prioritizing the development of public transport is the current Consensus of the transportation industry. [0003] Most of the current research on bus priority is to achieve time priority by giving buses the right of way at intersections. On this basis, the priority of bus priority signals to individual buses leads to the aggravation of the un...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08G1/123G06Q10/06G06Q50/30
Inventor 吴伟郭诗雅龙科军
Owner CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More