Embodiment 1
[0033] At present, the train operation adjustment method is often only adjusted for the delay within 0-5 minutes. Moreover, the turnover of trains is also closely related to the operation of the subway. In the operation diagram, the departure interval of the train directly affects the number of trains put into operation. Whether to turn back at the terminal also directly affects the arrival and departure time of each station. However, the existing methods for automatic adjustment of subway train diagrams often do not use operation adjustment methods such as additional driving of spare trains and halfway turnarounds, which cannot make full use of vehicle and line resources. At the same time, the existing automatic adjustment method of the subway train diagram usually does not consider the turnover of the vehicle bottom. Based on this, this embodiment provides an automatic adjustment method for subway train rescue, such as figure 1 shown, including:
[0034]101: Obtain fault in...
Embodiment 2
[0213] Taking Fangshan Line as an example, the planned operation diagram before adjustment is as follows Figure 5 shown. According to the method of embodiment 1 of the present invention, the automatic adjustment example of subway train rescue under the condition that the vehicle fails to run is as follows: Image 6 , 7 shown. The basic parameter configuration is shown in Table 1, where the indexes of trains and stations are calculated from 0:
[0214] Table I
[0215]
[0216] Figure 5 There are 20 uplink and downlink planned trains, in which the uplink train index is [0,19], and the downlink train index is [20,39]. The total number of car bottoms is 26. The ordinate of the operation diagram is the station, and there are 24 uplink and downlink stations, among which the depot is connected to the station with the index 23, and the abscissa indicates the time, and the departure interval of the uplink and downlink trains is 3 minutes. The solid line in the figure repre...