Positioner for hole site rechecking
A locator and hole position technology, which is used in construction, sheet pile wall, infrastructure engineering, etc., can solve problems such as low work efficiency, large review workload, and cumbersome measurement and stakeout process, so as to improve work efficiency and simplify the hole position. Review steps, the effect of reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0033] like figure 1 As shown, the locator for hole position review provided in this embodiment includes a first marking rod 1 and a second marking rod 2 . The first marking rod 1 and the second marking rod 2 are connected and arranged at an included angle. The first marking rod 1 is provided with a first marking point, and the distance between the position where the first marking rod 1 and the second marking rod 2 are connected and the first marking point is not less than the radius of the hole to be checked. The second marking rod 2 is provided with a second marking point, and the distance between the position where the second marking rod 2 is connected to the first marking rod 1 and the second marking point is not less than the radius of the hole to be reviewed.
[0034] In the process of using the hole position review locator provided in this embodiment, first align the connection between the first marking rod 1 and the second marking rod 2 with the hole center that has b...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


