Bridge construction hanging basket front hanging system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] The invention discloses a front hanging system of a bridge construction hanging basket, such as figure 1 As shown, the hanging basket suspender 8 is included, the hanging basket suspender 8 is a straight rod, has a top threaded section and a bottom threaded section, the top threaded section of the hanging basket suspender 8 is threadedly connected with a first fastener, and the hanging basket suspender The upper part of 8 is used to pass through and hang on the front upper beam 7 and the upper distribution beam 6 of the hanging basket; the second fastener is threaded on the bottom threaded section, and the second fastener is hung with a boom converter , the bottom of the boom converter and the lower distribution beam 9 are hinged through the pin 3, and the hinged structure effectively ensures the verticality of the hanging basket boom ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com