[0026] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] The invention discloses a front hanging system of a bridge construction hanging basket, such as figure 1 As shown, the hanging basket suspender 8 is included, the hanging basket suspender 8 is a straight rod, has a top threaded section and a bottom threaded section, the top threaded section of the hanging basket suspender 8 is threadedly connected with a first fastener, and the hanging basket suspender The upper part of 8 is used to pass through and hang on the front upper beam 7 and the upper distribution beam 6 of the hanging basket; the second fastener is threaded on the bottom threaded section, and the second fastener is hung with a boom converter , the bottom of the boom converter and the lower distribution beam 9 are hinged through the pin 3, and the hinged structure effectively ensures the verticality of the hanging basket boom ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 