Rotary expansion pile for foundation reinforcement and construction method thereof
A technology of foundation reinforcement and construction method, which is applied in foundation structure engineering, sheet pile wall, soil protection and other directions, can solve the problems of difficult piling, poor pile pullout resistance, low pile quality, etc., and achieves shortened construction period and high support. strength, enhance the effect of pull-out resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] This embodiment provides a rotary expansion pile for foundation reinforcement, such as figure 1 and figure 2 As shown, it includes a pile foundation main body and a grouting pipe 1, and the grouting pipe 1 is detachably connected inside the pile foundation main body.
[0043] In this embodiment, the grouting pipe 1 is made of steel pipe; it can be understood that in other embodiments, the grouting pipe 1 may also be made of other metal materials.
[0044] Further, such as image 3 As shown, the top of the grouting pipe 1 is provided with an upper thread 11, and the upper thread 11 is used to connect piling equipment. The middle part of the grouting pipe 1 is provided with a middle thread 14, and the upper side of the middle thread 14 is provided with a thickening section 13. The thickening section 13 is a pipe section whose diameter is greater than that of the main body of the grouting pipe 1; the middle thread 14 is used to keep the pile before the pile expansion wo...
Embodiment 2
[0055] This embodiment provides a construction method for a rotary expansion pile for foundation reinforcement, using the rotary expansion pile described in Embodiment 1, including the following steps:
[0056] 1) Transport the rotary piling equipment to the construction site and complete the installation.
[0057] 2) The prefabricated rotary expansion pile is vertically fixed by a fixing device, and then connected to the piling equipment through the connecting member 5 .
[0058] Wherein, the fixing device adopts the prior art, as long as the fixing of the main body of the pile foundation can be realized.
[0059] Such as Figure 5 As shown, the connecting member 5 includes a connecting main body and a threaded section 51 provided at one end of the connecting main body, and the threaded section 51 is connected with piling equipment. An opening 52 is provided at the end of the connecting body away from the threaded section 51 , the opening 52 has a certain depth, and its pur...