Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Measuring device for building engineering project management

A project management and construction engineering technology, applied in the field of measurement devices for construction project management, can solve the problems of affecting lighting, large amount of calculation, calculation process error, etc., and achieve the effect of high flexibility, high flexibility and convenient measurement

Pending Publication Date: 2021-05-25
张红强
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The major of construction engineering management has the dual attributes of management and engineering. It is based on construction engineering management and takes into account engineering management. In the management of construction engineering projects, managers need to organize and manage the construction of construction projects. Procedures, construction techniques, construction methods, quality standards, combined with the theoretical basis to prepare the construction organization plan for the project, organize, guide, supervise, and accept the construction. The location is measured in advance to avoid that the building on the south side will affect the lighting on the ground floor of the building on the north side after the building is completed. Most of the existing methods are based on the design height of the building, and then calculate the building The influence of building spacing and height on the north side of the building is not only relatively theoretical, but also has a very large amount of calculation, which can easily lead to errors during the calculation process. Other existing patented technology CN201920663022 In .4, a projection screen needs to be installed and the movement of the whole device is not portable enough. In view of this, we propose a measuring device for construction project management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Measuring device for building engineering project management
  • Measuring device for building engineering project management
  • Measuring device for building engineering project management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] In describing the present invention, it is to be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Orientation indicated by rear, left, right, vertical, horizontal, top, bottom, inside, outside, clockwise, counterclockwise, etc. The positional relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, Therefore, it should not be construed as limiting the invention.

[0029] In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.

[0030] In the description of the present invention, it should be noted that, unless otherwise specified and limited, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a measuring device for building engineering project management, and belongs to the technical field of building engineering measuring equipment. The measuring device for building engineering project management comprises a box body, wherein a cavity is formed in the middle of the top surface of the box body, a box cover is arranged on the upper portion of the cavity, two edge grooves are symmetrically formed in the upper ends of the inner walls of the two sides of the cavity, inner cavities are formed in the front ends of the inner walls of the edge grooves, gears are arranged in the middle of the inner cavities, a plurality of tooth grooves are linearly formed in the outer walls of the two sides of the box cover at equal intervals, two through grooves are symmetrically formed in the two sides of the bottom surface of the box body, supporting columns are embedded in the through grooves, threaded holes are formed in the front ends of the supporting columns, threaded rods are inserted in the threaded holes, limiting blocks are fixedly arranged at the lower ends of the inner side walls of the through grooves, limiting grooves are formed in the positions, which are opposite to the limiting blocks, of the inner walls of the supporting columns, and a measuring assembly is arranged in the middle of the cavity. According to the invention, the time consumed for dismounting and remounting when the measurement position is replaced is effectively reduced, the measurement efficiency is improved while the measurement work is facilitated, and the practicability is high.

Description

technical field [0001] The invention relates to the technical field of construction engineering measuring equipment, and more specifically, relates to a measuring device for construction engineering project management. Background technique [0002] The major of construction engineering management has the dual attributes of management and engineering. It is based on construction engineering management and takes into account engineering management. In the management of construction engineering projects, managers need to organize and manage the construction of construction projects. Procedures, construction techniques, construction methods, quality standards, combined with the theoretical basis to prepare the construction organization plan for the project, organize, guide, supervise, and accept the construction. The location is measured in advance to avoid that the building on the south side will affect the lighting on the ground floor of the building on the north side after th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G01C15/00
CPCG01C15/00
Inventor 张红强吴全周王普善汪小凯郭少华刘杰
Owner 张红强
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products