Construction method of connecting structure of partially-filled steel tube concrete pier with self-resetting function and foundation
A steel tube concrete and connection structure technology, applied in bridges, bridge construction, bridge parts, etc., can solve the problems of large permanent residual deformation, small lateral stiffness, low bearing capacity, etc., to achieve reduced residual deformation, safe and reliable quality, The effect of good seismic performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 , 2 As shown, the construction method of the connection structure between the partially filled concrete filled steel pipe concrete pier and the foundation with self-resetting function includes the following steps:
[0028] Step 1: Pouring concrete cap 9
[0029] Embed the support nut 11 in the foundation and anchor one end of the prestressed steel strand 6 and the prestressed steel bar 8; install a rectangular steel plate 14 on the foundation, pour a concrete cap 9 above the rectangular steel plate 14, and set the center of the concrete cap 9 For the reserved hole A, a plurality of reserved holes B10 are set around the concrete cap 9; the prestressed steel strand 6 is passed through the reserved hole A, and a plurality of prestressed steel bars 8 are passed through the reserved hole B10;
[0030] Step 2: Install steel pipe 1 and perforated plate 12
[0031] A perforated plate 12 is installed on the top of the concrete cap 9, and a steel pipe 1 is ins...
Embodiment 2
[0037] Such as Figure 4 As shown, the difference from Example 1 is that the cross-sectional shape of the steel pipe 1 is circular.