Method for judging missed transmission of monitoring alarm signal of transformer substation
A substation monitoring and alarm signal technology, applied in the direction of electrical components, circuit devices, information technology support systems, etc., can solve the time-consuming problems of missing signals, improve the level of safe operation, improve the level of automation and informatization, and improve accident handling effect of ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] A method for judging a substation monitoring alarm signal leakage, comprising the following steps:
[0024] Step 1. Analysis of power grid connection mode and establishment of power grid operation mode model;
[0025] Step 2. Cross-identification of multi-dimensional power grid operation mode;
[0026] Step 3, extracting maintenance and debugging events;
[0027] Step 4, the fault trip model is established, and the fault trip event is extracted;
[0028] Step 5. Analysis of missing signals.
[0029] The concrete realization method of described step 1 is:
[0030] (1) Grid connection mode analysis model: According to the power grid topology, analyze the wiring mode of each voltage level in the power grid, the equipment at each position in the bay, and the connection relationship between the bays. The main wiring methods include: 3 / 2 wiring (with wire knife), 3 / 2 wiring, double busbar + bypass, inner bridge wiring, line transformer group (unit wiring), single busbar. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


