An industrial control network and station technology, which is applied in the field of industrial control network security construction of energy stations, can solve problems such as difficulty, lack of standardized construction plans, and low popularity of industrial control network security construction knowledge, so as to reduce manpower and time investment. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0086] XXX power plant
[0087] The first attribute parameter:
[0088] Control area (safety I area): including 2 field-level distributed control systems (DCS system), 1 auxiliary control system
[0089] Non-controlled area (safety II area): including a field-level information monitoring system
[0090] Management information area (safety III area): contains 1 management information system
[0091] The second attribute parameter:
[0092] The station type is: thermal power plant
[0093] Installed capacity: 200MW
[0094] Construction plan calculation process:
[0095] 1. According to the second attribute parameter, if the site type is thermal power plant and the installed capacity is 200MW>100MW, it is determined that the site is the standard construction method of thermal power plants. Therefore, the collection scope of this construction plan is the control area of the power plant (safety area I). , non-control area (safety II area) and management information area (s...
Embodiment 2
[0099] XXX power plant
[0100] The first attribute parameter:
[0101] Control area (safety I area): contains 1 field-level distributed control system (DCS system)
[0102] Non-controlled area (safety II area): including a field-level information monitoring system
[0103] Management information area (safety III area): contains 1 management information system
[0104] The second attribute parameter:
[0105] The station type is: thermal power plant
[0106] Installed capacity: 80MW
[0107] Construction plan calculation process:
[0108] 1. According to the second attribute parameter, the station type is a thermal power plant, and the installed capacity is 80MW Image 6 shown;
[0109] 2. According to the first attribute parameter, the management information large area (safety III area) contains one management information system and requires one data collector, so only one data collector is required.
[0110] 3. Therefore, the detailed deployment of the construction pl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology