Multi-formwork type secondary lining trolley for tunnel construction
A tunnel construction and multi-formwork technology, which is applied in the direction of tunnel lining, tunnel lining, shaft lining, etc., can solve the problems of restricting the construction progress of the tunnel, the inability to apply the secondary lining construction, and the continuous ring formation of the secondary lining, so as to reduce the labor intensity, High degree of automation, time-saving and labor-saving operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described below in conjunction with drawings and embodiments.
[0027] This embodiment provides a multi-formwork type secondary lining trolley for tunnel construction, combined with Figure 1 to Figure 5 , comprising at least a formwork 1, a door frame 2 located in the formwork and a foot support 5 located at the bottom of the formwork and connected thereto, the door frame is provided with a boom-type pouring device, and the boom-type pouring device includes a sensor and a control mechanism, and the template is provided with More than two, the overall structure of the formwork is arched, and the formwork is provided with a pouring window 8, including a top formwork 9, two shoulder formworks 10 connected at both ends of the top formwork, two side formworks 11 connected under the shoulder formwork and Bottom overturn formwork 13 that is connected with side formwork, wherein top formwork is fixedly connected with shoulder formwork, sho...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


