A subcontracting method and subcontracting tool suitable for bidding and procurement of electric power materials
A technology of electric power materials and materials, which is applied in the field of data processing, can solve the problems of randomness, time cost and accuracy constraints, and not get rid of the problems of manpower sub-bidding and identification, so as to ensure rationality, avoid randomness and low efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 approach
[0080] The first embodiment - report-based subcontracting
[0081] In this embodiment, the subcontracting tool can be pre-configured with a table of common materials, and the data in the table of common materials can be defined into three types, namely, models, communication units, and accessories. In this embodiment, the types of electric energy meters and collection devices are defined as models.
[0082] In this embodiment, after receiving the export instruction, the subcontracting tool can export the preset list of commonly used materials to a specified location. In this way, the user can open the common materials table and modify or complete the missing common materials information. The subcontracting tool can also import the latest selected list of commonly used materials into the subcontracting tool after receiving the upload instruction. If the list of commonly used materials does not change, there is no need to update it every time. Table 1 is an example of the com...
no. 2 approach
[0172] The second embodiment - subcontracting based on multi-level fractal graph
[0173] The difference between this embodiment and the first embodiment is that instead of a material report, a multi-level fractal graph is used to realize machine identification and confirm the correctness of the sub-target. details as follows:
Embodiment 1
[0175] For the four projects a, b, c, and d in city A and city B, such as figure 1 and image 3 As shown, a fractal graph machine identification subcontracting method suitable for bidding and procurement of electric power materials includes:
[0176] S1. After creating subcontracting, import the reported materials summary fractal chart for this batch of electric power materials bidding and procurement;
[0177] S2. Establish an artificial intelligence matching model between auxiliary equipment and different types of materials;
[0178] S3. Use the artificial intelligence matching model between auxiliary equipment and different types of materials to classify the materials and auxiliary equipment represented in the reported material summary fractal chart to form a multi-level fractal chart;
[0179] S4. Configure the subcontracting principle for the subcontracting of the multi-level fractal graph.
[0180] The material in it is the electric energy meter, and the auxiliary equ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 