Construction method and device of multi-beam relay satellite task scheduling model
A task scheduling and relay satellite technology, applied in computational models, biological models, constraint-based CAD, etc., can solve the problem that the model cannot meet the task scheduling of multiple beams, and achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0065] The embodiment of the present application provides a method and device for constructing a multi-beam relay satellite task scheduling model, which solves the technical problem that the existing model cannot satisfy the task scheduling of multiple beams, and realizes the task scheduling that satisfies multiple beams. Reasonably arrange and dispatch the mission planning of relay satellites to improve the utilization rate of rel...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


