Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction equipment system pipeline collision removal optimization method and device

A technology of construction equipment and optimization methods, applied in the direction of multi-objective optimization, computer-aided design, special data processing applications, etc., to achieve cost-saving effects

Active Publication Date: 2022-01-28
UNIV OF SCI & TECH BEIJING
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the problem in the prior art that the pipeline scheme after collision optimization cannot be guaranteed to be the best in terms of actual indicators such as total length, total materials, construction time or comprehensive cost, the present invention proposes an optimization method for pipeline collision removal in construction equipment systems Method and device

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction equipment system pipeline collision removal optimization method and device
  • Construction equipment system pipeline collision removal optimization method and device
  • Construction equipment system pipeline collision removal optimization method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050]In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.

[0051] An embodiment of the present invention provides an optimization method for pipeline collision removal in a construction equipment system, and the method can be implemented by an electronic device, which can be a terminal or a server. like figure 1 The flow chart of the optimization method for pipeline collision removal of the construction equipment system is shown, and the processing flow of the method may include the following steps:

[0052] S101: Obtain a preset building structure model, preprocess the preset preliminary pipeline layout plan, and obtain a pipeline layout scheme;

[0053] S102: Calculate the pipeline parameters in the plan layout scheme to obtain a space layout scheme;

[0054] S103: Judging whether the obtained spatial layout ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction equipment system pipeline collision removal optimization method and device, and relates to the technical field of building design. Comprising the steps of obtaining a preset building structure model, preprocessing a preset pipeline plane arrangement preliminary scheme, and obtaining a pipeline plane arrangement scheme; calculating pipeline parameters in the plane arrangement scheme, and obtaining a space arrangement scheme; judging whether the obtained spatial arrangement scheme meets requirements or not, and determining a preliminary spatial arrangement scheme; judging whether the preliminary spatial arrangement scheme can continue to be optimized or not; if further optimization can be carried out, optimizing the obtained space arrangement scheme through an algorithm; and if the further optimization is not needed, confirming a final scheme, and outputting a spatial arrangement scheme of the pipeline and the BIM model. According to the invention, the BIM is utilized to provide help for pipeline comprehensive design optimization, intelligent one-key optimization of pipeline comprehensive collision is realized, and the cost is saved for owners.

Description

technical field [0001] The invention relates to the technical field of architectural design, in particular to an optimization method and device for removing collisions of construction equipment system pipelines. Background technique [0002] In construction projects, the pipelines of each equipment system are often designed by subcontractors of various disciplines and then integrated. Since the two-dimensional design method is mainly adopted at this stage, the equipment system pipelines completed by the subcontractors are prone to collisions in spatial positions. The BIM model (Building Information Modeling, Building Information Model) contains rich information of the building, especially the geometric information of the building components, which can effectively detect the collision of the pipelines of various professional equipment systems, and find out the collision points to remind the designers to carry out the pipeline inspection. Design Optimization. [0003] At pre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/18G06F111/06G06F113/14G06F113/16
CPCG06F30/13G06F30/18G06F2111/06G06F2113/16G06F2113/14
Inventor 赵鹤张东东刘喆刘晓刚岳清瑞
Owner UNIV OF SCI & TECH BEIJING