Construction equipment system pipeline collision removal optimization method and device
A technology of construction equipment and optimization methods, applied in the direction of multi-objective optimization, computer-aided design, special data processing applications, etc., to achieve cost-saving effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050]In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.
[0051] An embodiment of the present invention provides an optimization method for pipeline collision removal in a construction equipment system, and the method can be implemented by an electronic device, which can be a terminal or a server. like figure 1 The flow chart of the optimization method for pipeline collision removal of the construction equipment system is shown, and the processing flow of the method may include the following steps:
[0052] S101: Obtain a preset building structure model, preprocess the preset preliminary pipeline layout plan, and obtain a pipeline layout scheme;
[0053] S102: Calculate the pipeline parameters in the plan layout scheme to obtain a space layout scheme;
[0054] S103: Judging whether the obtained spatial layout ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


