Unlock instant, AI-driven research and patent intelligence for your innovation.

A method and device for optimizing pipeline collision removal in construction equipment system

A technology of construction equipment and optimization methods, applied in multi-objective optimization, computer-aided design, instruments, etc., to achieve cost-saving effects

Active Publication Date: 2022-03-22
UNIV OF SCI & TECH BEIJING
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the problem in the prior art that the pipeline scheme after collision optimization cannot be guaranteed to be the best in terms of actual indicators such as total length, total materials, construction time or comprehensive cost, the present invention proposes an optimization method for pipeline collision removal in construction equipment systems Method and device

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and device for optimizing pipeline collision removal in construction equipment system
  • A method and device for optimizing pipeline collision removal in construction equipment system
  • A method and device for optimizing pipeline collision removal in construction equipment system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050]In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.

[0051] An embodiment of the present invention provides an optimization method for pipeline collision removal in a construction equipment system, and the method can be implemented by an electronic device, which can be a terminal or a server. like figure 1 The flow chart of the optimization method for pipeline collision removal of the construction equipment system is shown, and the processing flow of the method may include the following steps:

[0052] S101: Obtain a preset building structure model, preprocess the preset preliminary pipeline layout plan, and obtain a pipeline layout scheme;

[0053] S102: Calculate the pipeline parameters in the plan layout scheme to obtain a space layout scheme;

[0054] S103: Judging whether the obtained spatial layout ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an optimization method and device for removing collisions of construction equipment system pipelines, and relates to the technical field of architectural design. Including: obtaining the preset building structure model, preprocessing the preset preliminary pipeline layout plan to obtain the pipeline layout scheme; calculating the pipeline parameters in the layout scheme to obtain the spatial layout scheme; Judging whether the spatial arrangement scheme meets the requirements, and determining the preliminary spatial arrangement scheme; judging whether the preliminary spatial arrangement scheme can continue to be optimized; if it can be further optimized, optimize the obtained spatial arrangement scheme through the algorithm; if not For further optimization, confirm the final plan, the spatial arrangement plan of the output pipeline and the BIM model. The present invention utilizes BIM to provide help for comprehensive design and optimization of pipelines, realizes intelligent one-key optimization of comprehensive collision of pipelines, and saves costs for owners.

Description

technical field [0001] The invention relates to the technical field of architectural design, in particular to an optimization method and device for removing collisions of construction equipment system pipelines. Background technique [0002] In construction projects, the pipelines of each equipment system are often designed by subcontractors of various disciplines and then integrated. Since the two-dimensional design method is mainly adopted at this stage, the equipment system pipelines completed by the subcontractors are prone to collisions in spatial positions. The BIM model (Building Information Modeling, Building Information Model) contains rich information of the building, especially the geometric information of the building components, which can effectively detect the collision of the pipelines of various professional equipment systems, and find out the collision points to remind the designers to carry out the pipeline inspection. Design Optimization. [0003] At pre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F30/13G06F30/18G06F111/06G06F113/14G06F113/16
CPCG06F30/13G06F30/18G06F2111/06G06F2113/16G06F2113/14
Inventor 赵鹤张东东刘喆刘晓刚岳清瑞
Owner UNIV OF SCI & TECH BEIJING