Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Power distribution network long-term load prediction method considering power grid service flow and control flow constraint

A technology of load forecasting and business flow, applied in forecasting, complex mathematical operations, instruments, etc., can solve problems such as the expected requirements of the distribution network and the inability to meet the forecasting accuracy, achieve accurate investment and construction, reduce insufficient power supply capacity, and improve forecasting. The effect of precision

Pending Publication Date: 2022-02-11
ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The amount of sample data required by these methods is small, and the prediction is simple, but the prediction accuracy often cannot meet the expected requirements of distribution network planning and construction.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network long-term load prediction method considering power grid service flow and control flow constraint
  • Power distribution network long-term load prediction method considering power grid service flow and control flow constraint
  • Power distribution network long-term load prediction method considering power grid service flow and control flow constraint

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The technical solutions in the present invention are clearly and completely described below in combination with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0042] Such as figure 1 As shown, the long-term load forecasting method of the distribution network considering the grid business flow and control flow constraints provided by the present invention includes:

[0043] S1. Determine the influencing factors that affect the development of load;

[0044] S2. Construct the MGM_BC(1, N) multivariate gray forecasting model according to the affected factors, and the predicted value of the load can be influenced according to the MGM_B...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a power distribution network long-term load prediction method considering power grid service flow and control flow constraints, and relates to the technical field of power distribution network load prediction, the method comprises steps of constructing an MGM_BC (1, N) prediction model according to influence factors, and influencing a prediction value of a load according to the MGM_BC (1, N) prediction model; generating a background value sequence according to the low-voltage governance service flow of the power grid enterprise, performing dynamic correction on the MGM_BC (1, N) prediction model according to the background value sequence, and performing load prediction through the corrected MGM_BC (1, N) prediction model to obtain a prediction result; correcting the prediction result according to the low-voltage governance control flow of the power grid enterprise, so that the prediction result is closer to the actual situation, the power distribution network load prediction result is closer to the development expectation of a region, the investment and construction of the power distribution network are more accurate, the problems of insufficient power supply capacity, overlong power supply radius, low voltage and the like in the power distribution network are effectively reduced.

Description

technical field [0001] The invention belongs to the technical field of distribution network load forecasting, and in particular relates to a long-term load forecasting method of a distribution network considering the constraints of network business flow and control flow. Background technique [0002] The distribution network is an important part of the construction of the smart grid, and it is also an indispensable and important link to promote the development of urban and rural areas in the region. However, due to the mismatch between regional distribution network load development and planning forecast, it often leads to voltage quality problems at the end of the distribution network, which directly affects the reliable operation of power supply equipment. In the stage of planning and construction of intelligent distribution network, strengthening the load forecasting ability of distribution network is of great significance to improve the voltage quality of distribution net...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06G06F30/20G06F17/13
CPCG06Q10/04G06Q50/06G06F17/13G06F30/20Y04S10/50
Inventor 周柯金庆忍丘晓茵宋益莫枝阅
Owner ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products