Connecting structure of tubular pile and prefabricated bearing platform and mounting construction method of tubular pile and prefabricated bearing platform

A technology of prefabricated caps and connecting structures, applied in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problems of low installation efficiency and difficult construction, and achieve the effect of reducing installation difficulty.

Active Publication Date: 2022-02-15
STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003]At present, the joint connection between prefabricated caps and pipe piles mostly adopts screw and bolt connection structure to connect prefabricated caps and prefabricated pipe piles together. There are several threaded holes, and the corresponding threaded holes are opened on the cap, and the prefabricated cap is placed on the upper side of the pipe pile, so that the threaded holes on the cap are aligned with the threaded holes on the pipe pile, and the bolts are inserted from the upper side of the cap , screwed into the threaded hole on the pipe pile, which requires that when placing the cap, the threaded hole on the cap should be completely aligned with the threaded hole on the pipe pile. The operation of lifting and adjusting the position is difficult in construction and low in installation efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Connecting structure of tubular pile and prefabricated bearing platform and mounting construction method of tubular pile and prefabricated bearing platform
  • Connecting structure of tubular pile and prefabricated bearing platform and mounting construction method of tubular pile and prefabricated bearing platform
  • Connecting structure of tubular pile and prefabricated bearing platform and mounting construction method of tubular pile and prefabricated bearing platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] Please also refer to Figure 1 to Figure 7 , this embodiment provides a connection structure between a pipe pile and a prefabricated cap, including a pipe pile 10 and a cap 20, a sealing plate 11 is provided inside the pipe pile 10, and a clamping assembly and a connecting rod are also included; the connecting rod has one end connected to the The bearing platform 20 is connected, and the other end protrudes from the lower side of the bearing platform 20; the clamping assembly includes two clamping parts 30 arranged on the upper part of the pipe pile 10 and rotatably connected with the pipe pile 10, Used to clamp the connecting rod; when the clamping assembly is in a relaxed state, the distance between the parts of the two clamping parts 30 located above the rotating joint is greater than the distance between the corresponding positions of the connecting rod, and the two The distance between the parts of the clamping parts 30 below the rotating connection is smaller than...

Embodiment 2

[0059] Please also refer to Figure 1 to Figure 7 , this embodiment provides a connection structure between a pipe pile and a prefabricated cap, including a pipe pile 10 and a cap 20, a sealing plate 11 is provided inside the pipe pile 10, and a clamping assembly and a connecting rod are also included; the connecting rod has one end connected to the The bearing platform 20 is connected, and the other end protrudes from the lower side of the bearing platform 20; the clamping assembly includes two clamping parts 30 arranged on the upper part of the pipe pile 10 and rotatably connected with the pipe pile 10, Used to clamp the connecting rod; when the clamping assembly is in a relaxed state, the distance between the parts of the two clamping parts 30 located above the rotating joint is greater than the distance between the corresponding positions of the connecting rod, and the two The distance between the parts of the clamping parts 30 below the rotating connection is smaller than...

Embodiment 3

[0072] Please also refer to Figure 1 to Figure 7 , the present embodiment provides a method of installation and construction of pipe piles and prefabricated caps, using the above-mentioned connection structure between pipe piles and prefabricated caps, including the following steps:

[0073] A. Dig a foundation pit, the depth of the foundation pit is less than or equal to the height of the cap 20, and the width of the foundation pit should be excavated according to the width of the cap 20;

[0074] B. Lay a 100-300mm cushion 70 at the bottom of the foundation pit;

[0075] C. Press the pipe pile 10 with the clamping assembly into the reserved position of the foundation pit;

[0076] D. Connect the connecting rod to the bearing platform 20, and make the lower end of the connecting rod protrude from the lower side of the bearing platform 20;

[0077] E. Lift the platform 20 so that the connecting rod is aligned with the clamping piece 30;

[0078] F. Slowly lower the bearing...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a connecting structure of a tubular pile and a prefabricated bearing platform and a mounting construction method of a tubular pile and a prefabricated bearing platform. The connecting structure of a tubular pile and a prefabricated bearing platform comprises a tubular pile and a bearing platform, a sealing plate is arranged in the tubular pile, the connecting structure further comprises a clamping assembly and a connecting rod, one end of the connecting rod is connected with the bearing platform, and the other end of the connecting rod protrudes out of the lower side of the bearing platform; the clamping assembly comprises two clamping pieces which are arranged on the upper portion of the tubular pile and rotationally connected with the tubular pile, and the clamping pieces are used for clamping the connecting rod; when the connecting rod is inserted into a clamping groove to a preset position, the two clamping pieces rotate relative to the tubular pile to clamp the connecting rod; and according to the mounting construction method of a tubular pile and a prefabricated bearing platform, the connecting structure of a tubular pile and a prefabricated bearing platform is used for mounting.

Description

technical field [0001] The invention belongs to the technical field of transmission line pile construction, and in particular relates to a connection structure between a pipe pile and a prefabricated cap and an installation and construction method for the pipe pile and the prefabricated cap. Background technique [0002] The transmission lines are arranged in dotted lines, and the traffic conditions and environmental conditions are poor. This kind of decentralized and multi-regional operation requires portable construction equipment and miniaturized foundation size. The load transmitted through the tower to the foundation, the foundation can meet the safe, reliable and stable operation of the transmission line. The pile foundation cap connections of existing transmission lines are mostly formed by cast-in-place technology. The cast-in-place technology is relatively mature, but the cast-in-place method not only pollutes the environment, but also increases manpower input and i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/14E02D5/30E02D15/02
CPCE02D27/14E02D5/30E02D15/02
Inventor 刘永宽张楷霍春燕陈明武坤王树峰张亚龙尹浩峰王万福门东浩李红旭吴晓锋赵贞欣李志强
Owner STATE GRID HEBEI ELECTRIC POWER CO LTD