Method and device for testing running of guide-mode sports car in novel train control system
A technology of train control system and testing device, which is applied in the direction of transportation and packaging, transportation center control system, railway car body parts, etc., can solve the problems of unguided mode sports car testing, etc., to improve test efficiency, increase running time, improve The effect of operating efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Please refer to the attached figure 1 , the application provides a test method for running a sports car in a pilot mode in a new train control system, wherein the method is applied to a test device for running a sports car in a pilot mode in a new train control system, and the method specifically includes the following steps:
[0032] Step S100: Obtain the engineering data table of the tested line;
[0033] Step S200: Obtain the guidance mode sent by the on-board subsystem of the first train according to the measured line engineering data table;
[0034]Specifically, the measured line engineering data table mainly includes a line data table and an approach data table, and the line data table includes the line position and planning of the main line and side line of the line, line status and environment, line running time, and line site information and other data; the route data table includes data information such as the train’s running route, running speed, allowable s...
Embodiment 2
[0079] Based on the same inventive concept as the test method for running a sports car in a new train control system in a new train control system in the foregoing embodiment, the present invention also provides a test device for running a sports car in a pilot mode in a new train control system. Please refer to the attached Figure 8 , the system includes:
[0080] A first obtaining unit 11, the first obtaining unit 11 is used to obtain the measured line engineering data table;
[0081] The second obtaining unit 12, the second obtaining unit 12 is used to obtain the guidance mode sent by the on-board subsystem of the first train according to the measured line engineering data table;
[0082] The first execution unit 13, the first execution unit 13 is used to adopt the forward and reverse normal line operation of a single vehicle through the guidance mode, and verify the comprehensive positioning of the first train and the driving permit sent by the RBC subsystem;
[0083] Th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


