Multi-dimensional collaborative progress planning method based on EPC project
A schedule plan and multi-dimensional technology, applied in the direction of calculation, instrumentation, data processing applications, etc., can solve problems such as unreasonable, untimely plan changes and adjustments, incomplete preparation, etc., to improve rationality, facilitate user display, and reduce preparation The effect of duration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] refer to Figure 1 to Figure 2 A further description will be given to the specific implementation of the method of the present invention based on the multi-dimensional collaborative schedule planning of the EPC project.
[0040] A method based on multi-dimensional collaborative schedule planning of EPC projects, which consists of four main parts:
[0041](1) The plan of the EPC project general contracting project is compiled online collaboratively, and the combination of cloud cache and underlying database is adopted to divide the original plan according to department, specialty, classification, responsible person, etc., and edit and store by block Display, first synchronize the block data to cloud storage through cloud caching, merge the contents of multiple blocks in the cloud, refresh and display in real time after the merger, and finally store the cloud data in a related database in a unified manner. During the editing process, we adopt the lock mode of the person ...