Steel structure hoisting device for building construction
A hoisting device and building construction technology, applied in building construction, construction, building material processing and other directions, can solve the problems of uneven stress on steel structure, high quality of steel structure, shaking of steel structure, etc. Endurance range, improved safety, improved usability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0022] see Figure 1-Figure 5 , a steel structure hoisting device for building construction, comprising a metal sheath 3 and a C-shaped rod 7, the lower part of the metal sheath 3 is sheathed and fixed on the upper end of the steel cable 1, the upper end of the metal sheath 3 is fixedly connected with the crane, and the steel cable 1 The lower end of the lower end is fixed with a hook 8 for connecting with the crane, the metal sleeve 3 is fixedly connected with the upper end of the C-shaped bar 7 through the connecting block 2, the lower end of the C-shaped bar 7 is welded and fixed with a fixed block 12, and the middle of the C-shaped bar 7 is set with Another fixed block 12, the fixed block 12 can move up and down on the C-shaped rod 7, realize the adjustment of the mutual distance between the two C-shaped fixed rings 13, each fixed block 12 is equipped with a fixed ring that can be opened and adjusted the size of the ring 13. In this embodiment, the C-shaped bar 7 can redu...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


