Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Railway construction organization plan automatic laying method and system and storage medium

A technology of organizational planning and layout, applied in computing, instruments, data processing applications, etc., can solve the problem that the sub-node decomposition is not detailed enough, the progress tracking of construction information, progress deduction progress early warning effect, critical path calculation, and the inability to realize construction organization. Plan real-time dynamic management and other issues to achieve optimal resources and benefits, and achieve the effect of automatic layout efficiently

Active Publication Date: 2022-04-12
INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +2
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This management method has the following problems: (1) At present, the slope graph is generated by inputting personnel experience information, and there is a lack of corresponding functions such as auxiliary plan preparation; (2) The sub-node decomposition of the entity structure is not detailed enough, only static graphics and data can be displayed, and cannot Realize automatic functions such as construction information progress tracking, progress deduction, progress warning effect, and critical path calculation; (3) The generated slope map cannot be edited or linked and adjusted, which makes it difficult to adjust the remaining construction organization plan in the later stage, and cannot realize construction organization. Real-time dynamic management of plans
If the construction progress cannot be dynamically grasped, it is easy to cause confusion in departmental collaboration, and various problems such as delays in construction period, reduced construction efficiency and increased costs will occur.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway construction organization plan automatic laying method and system and storage medium
  • Railway construction organization plan automatic laying method and system and storage medium
  • Railway construction organization plan automatic laying method and system and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with the embodiments and accompanying drawings. Here, the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not to limit the present invention.

[0039] Here, it should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only the structures and / or processing steps closely related to the solution according to the present invention are shown in the drawings, and the related Other details are not relevant to the invention.

[0040] It should be emphasized that the term "comprising / comprising" when used herein refers to the presence of a feature, element, step or component, but does not exclude the presence or addition of one or more other features, elements, steps or components.

[0041] Here, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a railway construction organization plan automatic arrangement method and system and a storage medium, and the method comprises the steps: building or importing construction organization plan information, the construction organization plan information comprises a plurality of operation types contained in a current construction project, and the grading operation item nodes contained in each operation type; determining a front node of each hierarchical operation item based on the operation item logic relation information between the hierarchical operation item nodes; determining the operation speed of each operation type based on the corresponding relationship between each operation type and the construction speed influence factor; performing forward and reverse arrangement based on the construction period starting time, the operation speed and the time constraint of the front node of each graded operation item, respectively generating the first starting time, the end time, the second starting time and the end time of each operation item, and determining key operations in each graded operation item and a key path formed by the key operations; and generating an automatic laying result of the railway construction organization plan based on the key operation and the key path formed by the key operation.

Description

technical field [0001] The invention relates to the technical field of high-speed railway construction, in particular to a method, system and storage medium for automatic layout of railway construction organization plans. Background technique [0002] At present, high-speed railway projects often involve long mileage, especially for high-speed railway project areas in Northwest China, which may involve basins, mountains, valleys and plateaus, etc. These engineering areas often involve active faults, high-intensity earthquakes, high ground stress, karst and karst water, harmful gases, goafs, bedding bias, gently dipping soft rocks, debris flows, rock piles, dangerous rockfalls, and deep-cut valley bank slopes. , deep soft soil, high ground temperature and other unfavorable geology. In this case, it will become very difficult to fully control the construction site situation and dynamically grasp the construction progress based on the existing construction organization managem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 王同军辛维克解亚龙陈杰刘伟司明伟贺晓玲陈志郭晓翠黄万朋郭祥白龙彪龚翔飞
Owner INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products