This invention discloses an intelligent generation method and
system for foundation pit construction schemes based on working condition constraint deduction. Through foundation pit
engineering data acquisition and analysis, construction of a foundation pit
engineering semantic
object model, construction of an
engineering constraint graph, retrieval and
adaptation verification of foundation construction scheme templates, deduction of construction working condition chains, parameter collaborative optimization and generation of candidate foundation pit construction schemes, generation of complete sets of construction schemes, consistency
verification, and final scheme output, the invention achieves intelligent and rapid generation of foundation pit construction schemes, improves the accuracy of scheme
adaptation to actual foundation pit working conditions, reduces labor costs, and ensures foundation pit construction safety and engineering quality. It solves the problems of low efficiency, insufficient
personalization, low matching degree with actual working conditions, and excessive reliance on human experience in existing foundation pit construction scheme generation technologies.