Visual construction whole-course safety management system based on BIM (Building Information Modeling)
A safety management and whole-process technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as space and time arrangement conflicts on the construction site, unclear problem locations, lack of image progress, etc., to achieve weakened professional ability, flexible use, Effects that are easy to visualize
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Such as figure 1 As shown, a BIM-based visual construction safety management system for the whole process, the system includes,
[0022] The collection module is configured to, based on the set area, collect the identification information of the actual project progress, and send the identification information to the processing module;
[0023] The processing module is configured to receive the identification information transmitted by the acquisition module, and based on the identification information, retrieve the module information in the visualization library, and at the same time, based on the identification information, select the display mode of the module information, and display the module information with it The methods are sent to the display module;
[0024] The display module is configured to dynamically display based on the BIM visualization model according to the preset display module based on the module information sent by the processing module and the d...
Embodiment 2
[0035] A BIM-based visual construction safety management system for the whole process, the system includes,
[0036] The collection module is configured to, based on the set area, collect the identification information of the actual project progress, and send the identification information to the processing module;
[0037] The processing module is configured to receive the identification information transmitted by the acquisition module, and based on the identification information, retrieve the module information in the visualization library, and at the same time, based on the identification information, select the display mode of the module information, and display the module information with it The methods are sent to the display module;
[0038] The display module is configured to dynamically display based on the BIM visualization model according to the preset display module based on the module information sent by the processing module and the display manner matched with the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com