Installation process of oil lubrication propeller tail shaft system
A system installation and propeller technology, applied in the direction of ships, etc., can solve the problems affecting the overall stability of the propeller stern shaft system, the fixing error of the stern tube, and the difficulty of accurate positioning, so as to improve positioning accuracy, ensure overall stability, reduce effect of error
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] according to figure 1 As shown, the present embodiment proposes an oil-lubricated propeller tail shaft system installation process, including the following steps:
[0060] Stern tube installation: locate the stern tube reference, determine the steel wire deflection, prepare for the stern tube installation, perform stern tube positioning, herringbone support arm positioning and stern tube fixation;
[0061] Stern tube bearing installation: carry out bearing inspection, clean and install the bearing;
[0062] Tail shaft installation: detect the tail shaft, clean and install the tail shaft, and inspect the installation;
[0063] Tail sealing device installation: use purchased standard parts;
[0064] Propeller installation: Detect the cooperation between the propeller and the tail shaft, and install the propeller into the tail shaft;
[0065] Installation of the first sealing device: adjust the shell of the first sealing device to be coaxial with the tail shaft;
[006...
Embodiment 2
[0069] according to figure 1 , 2 As shown, the present embodiment proposes an oil-lubricated propeller tail shaft system installation process, including the following steps:
[0070] The specific reference for positioning the stern tube is as follows: the positioning reference of the stern tube is the theoretical center line of the shaft system. Before the installation of the stern tube, according to the layout requirements of the shaft system, pull the steel wire on the theoretical center line of the shaft system. The steel wire is a piano wire. The selection is 75% of the breaking force of the steel wire; the relationship between the diameter of the steel wire and the pulling force is shown in the following table:
[0071]
[0072] Determining the deflection of the steel wire is specifically as follows: use the drawn steel wire to determine the axis of the shafting, and eliminate the deflection caused by the steel wire’s own weight. The calculation formula is as follows:...
PUM