Locking device on temporary pier of steel box girder cable-stayed bridge and construction method
A technology of locking device and temporary pier, which is applied in the direction of bridges, bridge construction, bridge parts, etc., to achieve efficient coordination and improve the selection range of tension and compression adjustment height
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to better understand the purpose, structure and function of the present invention, the present invention will be described in further detail below with reference to the accompanying drawings.
[0030] like figure 1 and figure 2 As shown, the locking device on the temporary pier of the steel box girder cable-stayed bridge in this embodiment includes a jack 4 and an elevation adjusting device 1 arranged on the upper end face of the temporary pier 8. The lower end of the jack 4 is provided with a first spacer 5, and the A second cushion block 6 is provided above the jack 4 , and the second cushion block 6 is installed on the lower end surface of the main beam 7 . like image 3 As shown, the lower end surface of the main beam 7 is also provided with an anchoring box 2 that cooperates with the elevation adjusting device 1. The elevation adjusting device 1 and the anchoring box 2 are connected by a steel strand 3, and the steel strand One end of line 3 is provide...