Engineering project contract full-process management method and system
A technology of engineering project and management method, which is applied in the whole process management method and system field of engineering project contract, which can solve problems such as management difficulties, inconsistent management, and complicated situations, and achieve the effect of convenient analysis of data, elimination of uncontrollable, and chaos
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] like figure 1 As shown, the method for managing the whole process of engineering project contract according to the preferred embodiment of the present invention includes the following steps:
[0040] Step S1, contract classification management: establish the basic classification of the engineering project contract, and set the corresponding operator authority. Specifically, the basic classification includes labor, professional, machinery leasing and material procurement, and assign the operator authority to business personnel, other Personnel cannot operate. Under the basic classification, sub-categories can be established, and the categories under each major category are used under the corresponding contracts.
[0041]Step S2, contract list management: based on the basic classification, establish a contract list classification, and set operator authority, the list classification corresponds to the basic classification, and specifically, the list classification also in...
Embodiment 2
[0059] The present invention also provides a whole process management system 200 for engineering project contracts, including: a classification management module 201 , a list classification management module 202 , an organizational structure mapping module 203 , a contract control switch setting module 204 and a contract management module 205 .
[0060] Specifically, the classification management module 201 is used to establish the basic classification of engineering project contracts. The list classification management module 202 is configured to establish a contract list classification based on the basic classification, and the list classification corresponds to the basic classification, so that each type of contract can only select the corresponding type of list as contract details. The organizational structure mapping module 203 is used to periodically pull the project data of the third-party platform from the third-party platform. After the data enters the system, a one-to...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

