Making process of drill pipe with internally and externally thickened end
A manufacturing method and technology of drill pipe, applied in the field of steel pipe end thickening, can solve problems such as short Miu, achieve the effects of improving fatigue life and avoiding puncture accidents
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] Referring to Fig. 6, it shows a schematic view of the drill pipe before thickening. Before the first thickening, the pipe end of the drill pipe body 1 with a length L1 is heated for the first time. The heating temperature is 1150-1250°C. The length of L1 is at least 550mm.
[0038] Since the drill pipe end is thickened, the length of the drill pipe must be shortened, so the total length LA of the drill pipe end participating in the deformation is the sum of the length Liu of the inner thickening section, the length Miu of the inner conical section and the shortening amount of the drill pipe Lv. The calculation formula of drill pipe shortening Lv is shown in the following formula.
[0039] Lv = ( Dou 2 - dou 2 ) ( L...
PUM
| Property | Measurement | Unit |
|---|---|---|
| length | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 