Internal excavation method through pile, and foundation pile structure
A construction method and pile sinking technology, which is applied in the field of foundation pile construction, can solve the problems of unreliable integration of the pusher head and prefabricated piles, the need for cost, and the inability to achieve peripheral friction enhancement, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0093] 1. Basic implementation form
[0094] (1) In the predetermined foundation where the prefabricated pile 1 is buried, the excavating head 18 protruding through the hollow part 2 of the prefabricated pile 1 excavates the pile hole 28, and in the pile hole 28 formed by cutting the foundation, the prefabricated pile 1 is lowered and sinks. Assume( image 3 (a)~(c)). The excavation diameter of the pile hole 28 excavated by the excavation head 18 is greater than or equal to the outer diameter of the prefabricated pile 1 to be set, for example, it is excavated from the ground 25 with a large diameter of about 1.4 to 1.5 times. Here, excavated soil is not discharged during excavation and prefabricated pile sinking, and there is no need to necessarily provide a function (screw, etc.) for soil discharge in the middle of the excavation rod as in the past.
[0095] When excavating foundations with high foundation strength or foundations with very high soil density, etc., in order ...