Sludge treatment method
A sludge treatment and mud cake technology, applied in the field of sludge treatment in urban sewage plants, can solve the problems of long production cycle, odorous gas discharge, and ocean pollution, and achieve the effects of protecting soil, increasing production, and shortening post-processing time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] A. Pyrolysis process:
[0022] 4 tons of pretreated mud cakes are injected into the pretreatment tank through the mud pump, and then 0.5 tons of straw are added, sent into the pretreatment tank through a conveyor, industrial sulfuric acid is added, and the pH value of the mud is adjusted to 3.05, and then Add 1 kg of nano-scale iron trichloride, and after mixing and stirring, add it to the hydrolyzed material storage tank. After the feeding is completed, close the inlet and outlet valves, open the inlet valve, and make the pressure reach 1.1Mpa, and the temperature is 150°C (about It takes half an hour), keep the pressure for 2 hours, and stop stirring 30-45 minutes before discharging. After the pressure keeping is over, open the drain valve to let the clarified liquid produced by pyrolysis be discharged directly. After the draining is completed, the steam drain valve can be opened. The water in the tank at a temperature as high as 150 °C will quickly drop to below 100 ...
Embodiment 2
[0032] A. Pyrolysis process:
[0033] 4 tons of pretreated mud cakes are poured into the pretreatment tank through the mud pump, and then 0.8 tons of straw are added, sent into the pretreatment tank through a conveyor, industrial sulfuric acid is added, and the pH value of the mud is adjusted to 4.15. Add 2 kg of nano-scale ferric trichloride, after mixing and stirring, add it to the hydrolyzed material storage tank. After the feeding is completed, close the inlet and outlet valves, open the inlet valve, and make the pressure reach 1.25Mpa, and the temperature is 190°C (about It takes half an hour), keep the pressure for 3 hours, stop stirring 30-45 minutes before discharging, and after the pressure keeping is over, open the drain valve to let the clarified liquid produced in the pyrolysis process be discharged directly. After the liquid discharge is completed, the vent valve can be opened, and the water in the tank, which is as high as 190°C, will quickly drop to below 100°C ...
Embodiment 3
[0043] A. Pyrolysis process:
[0044] 4 tons of pretreated mud cakes are injected into the pretreatment tank through the mud pump, and then 1 ton of straw is added, sent into the pretreatment tank through a conveyor, industrial sulfuric acid is added, and the pH value of the mud is adjusted to 4.85, and then Add 5 kg of nano-level aluminum trichloride, and after mixing and stirring, add it to the hydrolyzed material storage tank. After the feeding is completed, close the inlet and outlet valves, open the inlet valve, and make the pressure reach 1.25Mpa, and the temperature is 220°C (about It takes half an hour), keep the pressure for 4 hours, stop stirring 30-45 minutes before discharging, and after the pressure keeping is over, open the drain valve to let the clarified liquid produced in the pyrolysis process be discharged directly. After the liquid discharge is completed, the vent valve can be opened, and the water in the tank, which is as high as 190°C, will quickly drop to...