Train operation management system

A technology for operation management and trains, which is applied in the direction of operation center control system, automatic system, railway traffic management, etc. It can solve the problems of high density and difficulty in judging by operation commanders, and achieve the effect of convenient recovery

Inactive Publication Date: 2007-12-12
MITSUBISHI ELECTRIC CORP
View PDF1 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when the density of the daily driving timetable is high,

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Train operation management system
  • Train operation management system
  • Train operation management system

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0014] Embodiment 1

[0015] Fig. 1 is a configuration diagram of the first embodiment, and Fig. 2 is a block diagram showing the key parts of Fig. 1.

[0016] In Fig. 1 and Fig. 2, the lever plates 1a-1c installed in each station are manually operated, and the signal machine (not shown) and the switch machine (not shown) are controlled by the linkage devices 2a-2c. Using these control results, the station control devices 3a to 3c connected to the linkage devices 2a to 2c transmit the latest online status data of the train to the central processing unit 5 via the local area network 4. The display device 6 connected to the central processing unit 5 uses the distance as the vertical axis and the horizontal axis as the time to display the train operation graph.

[0017] The restoration schedule preparation device 7 is based on the latest online status sent by the station control devices 3a to 3c to the central processing unit 5 based on data such as the current schedule change inform...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A train operations management system enables an operations controller to carry out crew deployment disruption resolution easily. Preset restriction conditions stipulating restrictions in paths and crew member deployment disruption information are examined, warnings respective to the paths are output, and until all the warnings clear, with respect to paths in which multiple deployment disruptions have arisen, in order from the highest priority of urgent resolution of the deployment disruption, resolution information is successively sent to crew member deployment disruption forecasting means and crew deployment information is updated, and when the warnings have been cleared the crew deployment information recorded in crew deployment information registering means is suggested as resolution information.

Description

technical field [0001] The present invention relates to a train operation management system for use by drivers and crew members who are crew members on trains. Background technique [0002] In the existing operation management system, the lever plate operation linkage device installed at each station controls the signal machine and the switch machine. Then, the latest online status data is sent from the station control device connected to the linkage device to the central processing unit through the local area network. The recovery timetable compiling device simulates each train according to the latest online status information sent to the central processing unit and the current day's timetable. Based on the results of this simulation and the pre-input travel timetable, a judgment rule is compiled to determine the use of trains, and the simulation is repeated until all registered trains arrive at the terminal station, thereby creating a restored travel timetable. [0003] ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): B61L27/00
CPCB61L27/0033G06Q10/063116B61L27/18B61L27/04B61L23/14
Inventor 片冈健司府川达也
Owner MITSUBISHI ELECTRIC CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products