Construction method of embankment
A dyke and wire technology, applied in the field of dyke construction, can solve the problems of reduced flexibility, high water pressure and buoyancy of dykes, and easy rusting of stone mesh bags, so as to improve the supporting force and protect the ecosystem.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Other objects and aspects of the invention will become apparent from the following description of preferred embodiments taken in conjunction with the accompanying drawings, the invention being set forth hereinafter.
[0017] figure 1 with figure 2 A schematic diagram of a dike and breakwater constructed according to an embodiment of the invention is shown.
[0018] Such as figure 1 with figure 2 As shown in , the dike or breakwater is constructed by connecting the first wire 111 and the second wire 600 of the dike unit by means of a connector 700 . The connector 700 enhances the connection force of the dam unit by connecting the first wire 111 and the second wire 600 of the dam unit. Therefore, the slope of the embankment or breakwater is stabilized, and the embankment unit is prevented from being washed away by high water pressure and buoyancy due to the high-speed flowing water of the flood.
[0019] In the following, reference will be made to Figure 3 to Fig...