Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

97results about How to "Stable slope" patented technology

Slope protection pile pouring and cable bolting construction method for deep foundation pit

The invention discloses a slope protection pile pouring and cable bolting construction method for a deep foundation pit. The method comprises the following steps of: 1, making preparations before construction; 2, pouring a slope protection pile, namely measuring, paying off, molding and constructing the poured slope protection pile, punching holes on the poured slope protection pile, binding and hoisting a steel reinforcement cage for molding the slope protection pile, pouring concrete into the poured slope protection pile and constructing a crown beam at the top end of the pile; and 3, excavating a foundation in a layered form and constructing anchor ropes on different rows, namely excavating a first-layer foundation, arranging a first row of anchor ropes, arranging a steel waist rail, arranging anchor heads of the anchor ropes, tensioning the anchor ropes and finishing excavating processes of different layers of foundations and arranging different rows of anchor ropes. The method has a reasonable design, simple construction steps, low investment cost, large support depth and good using effect, and solves the problems of complicated construction steps, high construction cost, inconvenience in control, easy damage to surrounding pipelines, roads, buildings and the like, large construction space and the like existing in the conventional double-row pile supporting method can be solved.
Owner:SCEGC NO 6 CONSTR ENG GRP CO LTD

Revegetation method for tailings dams in northern region

A revegetation method for tailings dams in the northern region includes the following steps: (A) slopes are cleaned up and leveled in order to eliminate potential geological hazards; (B) the surface layer of a tailings dam is covered by 10 to 15 centimeters of planting soil; (C) slurry-like plant-growing soil culture medium is sprinkled on the surface of the covering soil, so that a plant-growing substratum with a stable, excellent crumble structure is formed; (D) plant seeds with high stress resistance combined with artificial soil are chosen to be sowed on the surface of the plant-growing substratum, so that a seed layer which is about 2 centimeters in thickness is formed; (E) a management measure with a spray irrigation system and protective nets is adopted to maintain epigaeous seedlings at the late stage. The revegetation method has the advantages that the revegetation method can enhance the adaptability of plants to the complex adverse environment of a tailings pond, including stronger drought-resisting, saline-alkali tolerant, barren-tolerant and nutrient-obtaining capabilities, the method can be utilized to restore the ecology of the slopes of the tailings dam and build a steady vegetation layer, and also has the effects of stabilizing the slopes, conserving water and soil and inhibiting runoff and flying tailings sand.
Owner:青岛冠中生态股份有限公司

Ecological restoration system and method for high and steep bare rock slopes

The invention provides an ecological restoration system and method for high and steep bare rock slopes. The ecological restoration system comprises a first plastic-coated steel wire chain link fence,a soil layer, an ecological restoration planting mat, a seedling substrate layer and a second plastic-coated steel wire chain link fence from inside to outside from the slope surfaces of the high andsteep bare rock slopes. The ecological restoration method comprises the steps that loose gravel danger eliminating is conducted on the slope surfaces of the high and steep bare rock slopes, and the slope surface is cleaned and leveled; holes are drilled in the slope surface, and anchor rods are embedded; the first plastic-coated steel wire chain link fence and U-shaped geogrid wing tanks are hungand fixed to the anchor rods; soil is spray-seeded into the U-shaped geogrid wing tanks and sprayed among the U-shaped geogrid wing tanks; the ecological restoration planting mat and the second plastic-coated steel wire chain link fence are hung and fixed to the anchor rods; and a seedling substrate is spray-seeded. The ecological restoration system and method are suitable for the high and steep bare rock slopes on the two sides of a mountain body, a highway, a railway and a river so as to achieve quick greening protection, a high-strength protecting layer is formed in a short period, the slopes are stabilized, the natural environment is beatified, and the ecological restoration system and method are suitable for being applied and popularized.
Owner:巩广朋 +1

Microorganism curing striking-in type steel pipe soil nail and construction method thereof

The invention discloses a microorganism curing striking-in type steel pipe soil nail and a construction method thereof. The steel pipe soil nail mainly comprises a steel pipe and angle iron. The steelpipe comprises a pipe head and a pipe body. The construction method mainly includes the steps that the steel pipe soil nail is manufactured, and the steel pipe soil nail is struck into mud through apneumatic down-the-hole hammer; sporosarcina pasteurii is activated and subjected to enlarge cultivation, and a microorganism bacterium solution is obtained; the obtained microorganism bacterium solution is injected into the soil nail through the steel pipe soil nail so that the microorganism bacterium solution can be spread in sandy soil; a composite nutrient solution is prepared and includes 0.5mol / L of urea and 0.5 mol / L of calcium salt; the composite nutrient solution is injected into the steel pipe soil nail and a slope face, and an anchoring body is formed; and the above steps are repeated till the strength of the soil nail reaches the design requirement, and the microorganism curing striking-in type steel pipe soil nail is obtained. By means of the microorganism curing striking-intype steel pipe soil nail and the construction method thereof, the sandy soil in the soil nail is cemented through a cementing effect of microorganisms, the mechanical property of a slope soil body isimproved, the integrity and self stability of the slope soil body are improved, and the slope can be more stable.
Owner:GUANGDONG UNIV OF TECH

Energy consumption self-recovery pressure type anchor rod and construction method thereof

The invention provides an energy consumption self-recovery pressure type anchor rod and a construction method thereof. The pressure type anchor rod comprises an anchor rod system and an energy consumption self-recovery system. The anchor rod system comprises a rod body, a casing pipe, an anchorage device and a cushion plate. The front end of the anchor rod system is fixed to a soil retaining structure through the anchorage device and the cushion plate, the rear end of the anchor rod system is connected with the energy consumption self-recovery system, and slurry is injected to the periphery ofthe anchor rod system. The energy consumption self-recovery system comprises a hydraulic cylinder, springs, a baffle, a piston, a piston rod, viscous liquid, a throttling hole and a pressure bearingcylinder. The pressure bearing cylinder is connected with the front end of the hydraulic cylinder, and the cylinder is filled with the viscous liquid; one end of the piston rod is fixed to the piston,and the other end of the piston rod penetrates the hydraulic cylinder and the pressure bearing cylinder to be connected with the rod body; the baffle is arranged on the piston rod, and the two sidesof the baffles are sleeved with the springs; and under the impact and reciprocating load effect, the springs are pulled and pressed to drive the piston to move in the hydraulic cylinder, deformation yielding energy consumption and self recovery of the anchor rod are achieved, and the energy consumption and vibration reduction effects are obvious. The technology is simple and feasible, the self recovery device is arranged at the bottom of the anchor rod so that construction can be convenient, and the external slurry has a good protection effect.
Owner:NINGXIA UNIVERSITY

Combined construction method for anti-shock ecological blankets and W-OH and slope protection structure

The invention provides a combined construction method for anti-shock ecological blankets and W-OH and a slope protection structure. The combined construction method comprises the following steps of (1) regulating a slope; (2) measuring field data; (3) laying the anti-shock ecological blankets along the direction parallel to a highway or a river way; (4) comprehensively fixing each two adjacent anti-shock ecological blankets in an overlapping stitching mode and a fixing nail fixing mode; (5) placing soil on the surfaces of the anti-shock ecological blankets; (6) spraying 2%-20% of W-OH liquor on the surfaces of the anti-shock ecological blankets with soil on the surfaces; and (7) maintaining plants. The slope protection structure comprises the anti-shock ecological blankets laid along the slope of a roadway or a river way, wherein each two adjacent ecological blankets are in overlapping stitching and are fixed by using fixing nails; two ends of each ecological blanket are fixed by using anchor rods; grooves are formed in the bottoms of the topmost ecological blanket and the bottommost ecological blanket; a composite fiber fabric layer is paved in each groove and is pressed by using a gabion stone cage; and the ecological blankets are stitched with the embedded composite fiber fabric layers. By using the construction method, the anti-erosion property of a construction road or a construction river way is greatly improved, water and soil loss is controlled, a slope is stabilized, and the ecology is recovered.
Owner:青岛润国生态科技发展有限公司

Remoulding method of landform of gangue accumulation area

InactiveCN107170022AReduce workload and costReduce weightTexturing/coloringClimate change adaptationNatural successionWorkload
The invention discloses a remoulding method of the landform of a gangue accumulation area. The remoulding method comprises steps of using a drainage basin landform theory and a river landform geomorphologic shape mathematical model to simulate the natural landform; using an SEDCAD flood peak correction flow model to carry out complementation design on the remoulded landform; using the design model data to a civil engineering construction and designing module developed through the Carlson software; carrying out river channel protection engineering of the landform remoulding of the gangue accumulation area; and remoudling the landform and carrying out erosion potential evaluation. According to the invention, by introducing the drainage basin landform theory and the landform geomorphologic shape mathematical model into the landform design of the gangue accumulation area, errors caused by the mechanical method are reduced; meanwhile, the civil construction and design module is used for carrying out construction guidance; by use of the balancing of the reduction and the filling, workload and cost are reduced; the plant natural succession rule is obeyed, so the plant stability is improved; and quantitative reference is provided for the mining region recovery model.
Owner:山西省林业科学研究院

Water-resistant ventilation type protective structure for roadbed slope

The invention discloses a water-resistant ventilation type protective structure for a roadbed slope. The water-resistant ventilation type protective structure for the roadbed slope comprises a plurality of slope protecting plates arranged on the roadbed slope, wherein the multiple slope protecting plates are distributed on the roadbed slope in a multilayer mode and all extend in the longitudinal direction of a roadbed, one lateral edge, far away from the roadbed slope, of the slope protecting plate at the upper layer extends to the upper portion of the slope protecting plate at the lower layer, one lateral edge, near the roadbed slope, of the protective plate at the top layer is connected with a road shoulder in an abutting mode, one lateral edges, far away from the roadbed slope, of the multiple slope protecting plates are inclined downwards, a plurality of first supporting frames distributed at intervals are arranged under the multiple slope protecting plates, the upper ends of the first supporting frames are connected with the bottom of one side, far away from the roadbed slope, of the slope protecting plate at the upper layer, and the middles of the first supporting frames are connected with the slope protecting plate at the lower layer. Under the condition of not affecting ventilation of the roadbed, the water-resistant ventilation type protective structure for the roadbed slope can effectively prevent rainwater from seeping into the roadbed from the roadbed slope and prevent a frozen soil foundation and a loess foundation from being corroded by water, thereby protecting the stability of the frozen soil foundation and the loess foundation.
Owner:CHANGAN UNIV

Three-layer step ecological functional belt structure for river channel project

InactiveCN104846778AIncrease water surface rateSolve waterlogging and land acquisitionCoastlines protectionElectronic band structureShore
The invention discloses a three-layer step ecological functional belt structure for a river channel project. The three-layer step ecological functional belt structure comprises a three-layer step ecological functional belt; the three-layer step ecological functional belt is composed of a bottom aquatic plant layer, a middle shore lead and a top levee crown road layer; the aquatic plant layer is connected with the shore lead by use of a 0.8-1.2m high vertical wall built with ecological geo-bags; the shore lead is connected with the levee crown road layer by use of ecological interlocking bricks and a turf slope at the gradient of 1: 2 or 1: 3. The three-layer step ecological functional belt structure for the river channel project has the advantages that the renovated river channel is capable of meeting the flood drainage requirement of the surrounding region of the river channel, and also capable of forming a sightseeing leisure shore belt, and due to the great tank storage difference of different water surface elevations, the water surface ratio is increased, the problem of contradiction of flood storage in the surrounding region of the river channel and land acquisition can be solved favorably, the overall slope of the river channel is gentled and the river channel slope can be kept stable.
Owner:YELLOW RIVER ENG CONSULTING

All-prefabricated assembling type environmentally friendly retaining wall and construction method

PendingCN108867689AImprove long-term greening effectReduce dosageArtificial islandsUnderwater structuresEngineeringRetaining wall
The invention provides an all-prefabricated assembling type environmentally friendly retaining wall and a construction method. Building block components and connecting components of the all-prefabricated assembling type environmentally friendly retaining wall can be prefabricated in a factory, and are assembled in field to form the structural body of the retaining wall, and thus, the shortcomingsthat a foundation and connectors of an existing assembling type retaining wall require to use cast-in-place structures, thus, the construction period is long, and construction is not facilitated are overcome. The structural body of the retaining wall is formed by transversely and longitudinally assembling prefabricated building block units, and is located on a structural foundation, and each prefabricated building block is provided with a vegetative plate which extends forwards from the outer wall of a front plate. The adjacent prefabricated building blocks which are assembled transversely andlongitudinally are connected by clamping structures arranged on side walls of two sides of the prefabricated building block units and then are locked, or are connected by prefabricated connectors which are arranged vertically and then are locked. Each prefabricated building block inner unit is provided with a vertical through inner cavity, after the prefabricated building block inner units are assembled transversely, each inner cavity is filled with pure soil, sandy gravels or broken stones in a layered manner the pure soil, the sandy gravels or the broken stones are compacted to form a filling body, and self-stabilizing of the structural body of the retaining wall is realized with the aid of self-gravity of the various prefabricated building block units and the filling bodies in the prefabricated building block units.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products