Method and system for adjusting position of resource block
An adjustment method and technology for resource blocks, which are applied in the field of resource block position adjustment methods and systems, can solve problems such as unresolved and data loss, and achieve the effect of avoiding data loss.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0051] In this example, if image 3 As shown, the BS sends a MAP message containing a new PA allocation at the current time T1, indicating the release of the resource block of MS1 and the location and size of the resource block, and indicating that other MSs will move their resource block positions to fill the resource block caused by the release of the resource block. At the same time, this MAP message indicates that the effective time of resource movement is T2.
[0052] according to image 3 , at time T1, MS2 did not correctly decode the above-mentioned MAP message sent by the BS, and MS2 will send a feedback message NACK at a subsequent time T3 to inform the BS. MS2 makes an error in decoding the MAP message at T1 but does not stop sending and receiving data.
[0053] according to image 3 , BS receives the above-mentioned NACK message sent by MS2, and then sends a MAP message including PA recovery information (information at T1 time) to MS, and MS2 and MS3 will move re...
example 2
[0057] In this example, if Figure 4 As shown, the BS sends a MAP message containing a new PA allocation at the current time T1, indicating the release of the resource block of MS1 and the location and size of the resource block, and indicating that other MSs will move their resource block positions to fill the resource block caused by the release of the resource block. At the same time, this MAP message indicates that the effective time of resource movement is T2.
[0058] according to Figure 4 , at time T1, MS2 did not correctly decode the above-mentioned MAP message sent by the BS, and MS2 will send a feedback message NACK at a subsequent time T3 to inform the BS. MS2 makes an error in decoding the MAP message at T1 but does not stop sending and receiving data.
[0059] according to Figure 4 After receiving the NACK message sent by MS2, the BS sends a MAP message including PA recovery information (information about T1 time) to MS.
[0060] according to Figure 4 , fr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com