High-speed railway hoisting and laying method and special gantry crane running rubber cushion blocks
A high-speed railway and laying method technology, which is applied in laying tracks, roads, bridge construction, etc., can solve the problems that the door crane cannot walk, the waterproof layer is damaged, and the wheels are prone to roll, so as to increase the mileage and friction of one trip. Easy to install and disassemble, to meet the effect of uniform transmission
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The specific structure of the hoisting and laying method of the high-speed railway and the special gantry crane walking rubber block of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0020] Such as figure 1 As shown, the special-purpose door crane walking rubber pad for the hoisting and laying method of high-speed railway of the present invention comprises a rubber pad body 1, the lower surface of the pad body 1 is provided with a groove 2, and the upper surface of the pad body 1 is provided with a steel plate bearing surface 3, and the pad body 1 is provided with a connecting jack 4. Such as figure 2 As shown, the lower surface of the pad body 1 is provided with a plurality of transverse grooves 2 along the longitudinal direction, and the upper surface of the pad body 1 is provided with a steel plate bearing surface 3 . Such as image 3 As shown, a drain tank 6 and an anti-collision wall 7 are arrang...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 