Method and equipment for processing resource conflict
A resource conflict and processing method technology, which is applied in the fields of electrical components, wireless communication, broadcast service distribution, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0104] The following will be described with specific examples. In the specific implementation, the image 3The conflict situation shown is illustrated as an example. According to the time and resources for PDCCH to activate SPS data transmission, and the period of SPS, SPS has resources on 5, 6, and 7 PRBs of subframe 7 of radio frame 7, and according to the pattern configured by MBSFN, MBSFN subframes are also in radio frame 7 Subframe 7 appears. Then the resources for sending SPS data conflict with the resources for sending MBSFN subframes. At this time, the sending of SPS data is canceled, and the UE also stops receiving SPS resources on PRBs 5, 6, and 7 of subframe 7 of radio frame 7. If the MBMS service is received on the subframe, the MBMS service will still be received on the subframe.
[0105] After steps 402 and 403, the implementation may further include:
[0106] After the base station cancels sending SPS data on conflicting resources, it sends SPS data on downl...
Embodiment 2
[0114] The following will be described with specific examples. by image 3 The conflict situation shown is illustrated as an example. According to the time and resources for PDCCH to activate SPS data transmission, and the period of SPS, SPS has resources on 5, 6, and 7 PRBs of subframe 7 of radio frame 7, and according to the pattern configured by MBSFN, MBSFN subframes are also in radio frame 7 Subframe 7 appears. Then the resource for sending SPS data conflicts with the resource for sending the MBSFN subframe. At this time, the SPS data is canceled and sent on PRB 5, 6, and 7 of subframe 7 of wireless frame 7, and subframe 9 is judged to be the latest, non-conflicting, and ok. In the downlink subframe where the SPS data is sent, the SPS data that has been canceled is sent on the 5th, 6th, and 7th PRBs of the subframe 9.
[0115] The UE also stops receiving SPS data on PRBs 5, 6, and 7 of subframe 7 of radio frame 7, and receives SPS data on PRBs 5, 6, and 7 of subframe 9...
Embodiment 3
[0124] The following will be described with specific examples.
[0125] First, the base station notifies the UE through signaling that if the resource for sending the MBSFN subframe and the resource for sending the SPS data conflict, the SPS data will be sent in the next 2 to 3 subframes.
[0126] by image 3 Take the conflict situation as an example to illustrate, according to the time and resources for PDCCH to activate SPS data transmission, and the cycle of SPS, SPS has resources on 5, 6, and 7 PRBs of subframe 7 of radio frame 7, and according to MBSFN configuration pattern, the MBSFN subframe also appears in subframe 7 of radio frame 7. Then the resources for sending SPS data conflict with the resources for sending MBSFN subframes. At this time, the SPS data is canceled and sent on PRBs 5, 6, and 7 of subframe 7 of radio frame 7, and is sent on PRBs 5 and 6 of subframe 0 of radio frame 8. , Send the canceled SPS data on 7PRB.
[0127] The UE also stops receiving SPS d...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com